Automation index
How much of a Wildland firefighter’s job can AI already do?
A fire-front map comes earlier. Going onto the slope with the wind against you do not.
This percentage does not predict how many people will lose their jobs.
Task comparison
IS WORK OVER?
Wildland firefighter
18%
AI can already do 18% of this job.
#564 / 643
View rankingWildland firefighter
Where the time goes
Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.
The time saving for each task is estimated separately.
| Task | Share | AI | Points |
|---|---|---|---|
Logs, map and the day’s attack plan.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 32% | +5.1 |
Line, hose-lay and the spot fire.EstimateNo public source provides a precise figure. This is our estimate. | 24% | 6% | +1.4 |
Tools, pump and the water that does not arrive.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 18% | +2.9 |
Night watch, lookout and the flare-up.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 22% | +3.5 |
Coordinate aircraft and the command post.EstimateNo public source provides a precise figure. This is our estimate. | 14% | 28% | +3.9 |
Get out whole and leave nobody behind.EstimateNo public source provides a precise figure. This is our estimate. | 14% | 10% | +1.4 |
| Total | 100% | 18% |
Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low
Skills and activities
- fight wildfires
- cut line
- lay hose
- night watch
- portable pump
- air assets
- fire-front map
- spot fires
Sources for this job· O*NET 33-2022.00· ESCO/ISCO 5411
IS WORK OVER?
Metro driver
19%
#495 / 643
View rankingMetro driver
Where the time goes
Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.
The time saving for each task is estimated separately.
| Task | Share | AI | Points |
|---|---|---|---|
Checks, tests and the cab log.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 32% | +5.1 |
Drive, stop at platforms and regulate running.EstimateNo public source provides a precise figure. This is our estimate. | 24% | 8% | +1.9 |
Incidents, evacuation and talk to Control.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 22% | +3.5 |
Timetables, reliefs and the day’s orders.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 28% | +4.5 |
Passengers, platforms and announcements.EstimateNo public source provides a precise figure. This is our estimate. | 14% | 18% | +2.5 |
Rules, fatigue and liability for the train.EstimateNo public source provides a precise figure. This is our estimate. | 14% | 12% | +1.7 |
| Total | 100% | 19% |
Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low
Skills and activities
- drive metro trains
- stop at platforms
- regulate running
- evacuate tunnels
- talk to control
- cab checks
- handle incidents
- drive under ATO
Sources for this job· O*NET 53-4041.00· ESCO/ISCO 8311