IS WORK OVER?

Automation index

How much of a Wildland firefighter’s job can AI already do?

A fire-front map comes earlier. Going onto the slope with the wind against you do not.

This percentage does not predict how many people will lose their jobs.

Task comparison

Wildland firefighter

Where the time goes

Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.

The time saving for each task is estimated separately.

TaskShareAIPoints
Logs, map and the day’s attack plan.
Estimate

No public source provides a precise figure. This is our estimate.

16%32%+5.1
Line, hose-lay and the spot fire.
Estimate

No public source provides a precise figure. This is our estimate.

24%6%+1.4
Tools, pump and the water that does not arrive.
Estimate

No public source provides a precise figure. This is our estimate.

16%18%+2.9
Night watch, lookout and the flare-up.
Estimate

No public source provides a precise figure. This is our estimate.

16%22%+3.5
Coordinate aircraft and the command post.
Estimate

No public source provides a precise figure. This is our estimate.

14%28%+3.9
Get out whole and leave nobody behind.
Estimate

No public source provides a precise figure. This is our estimate.

14%10%+1.4
Total100%18%

Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low

Skills and activities

  • fight wildfires
  • cut line
  • lay hose
  • night watch
  • portable pump
  • air assets
  • fire-front map
  • spot fires

Sources for this job· O*NET 33-2022.00· ESCO/ISCO 5411

Packaging engineer

Where the time goes

Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.

The time saving for each task is estimated separately.

TaskShareAIPoints
Spec, 3D and the drop test.
Estimate

No public source provides a precise figure. This is our estimate.

18%48%+8.6
The packing line and the one that will not fit.
Estimate

No public source provides a precise figure. This is our estimate.

16%22%+3.5
Material, recyclability and unit cost.
Estimate

No public source provides a precise figure. This is our estimate.

16%36%+5.8
Supplier, die and pack colour.
Estimate

No public source provides a precise figure. This is our estimate.

16%28%+4.5
Marketing, legal and not lying on the pack.
Estimate

No public source provides a precise figure. This is our estimate.

18%14%+2.5
That it survives the trip, and not oversizing the plastic.
Estimate

No public source provides a precise figure. This is our estimate.

16%12%+1.9
Total100%27%

Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low

Skills and activities

  • design packs
  • drop test
  • packing line
  • recyclability
  • die-cut
  • unit cost
  • pack spec
  • 3D prototype

Sources for this job· O*NET 17-2112.00· ESCO/ISCO 2141

Analyse my job

Jobs with similar scores

  1. 551Forest ranger18%
  2. 552Aerial technician18%
  3. 553Varnisher18%
  4. 555Commercial diver18%
  5. 556Camera operator18%
  6. 557Bartender18%