IS WORK OVER?

Automation index

How much of a Wildland firefighter’s job can AI already do?

A fire-front map comes earlier. Going onto the slope with the wind against you do not.

This percentage does not predict how many people will lose their jobs.

Task comparison

Wildland firefighter

Where the time goes

Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.

The time saving for each task is estimated separately.

TaskShareAIPoints
Logs, map and the day’s attack plan.
Estimate

No public source provides a precise figure. This is our estimate.

16%32%+5.1
Line, hose-lay and the spot fire.
Estimate

No public source provides a precise figure. This is our estimate.

24%6%+1.4
Tools, pump and the water that does not arrive.
Estimate

No public source provides a precise figure. This is our estimate.

16%18%+2.9
Night watch, lookout and the flare-up.
Estimate

No public source provides a precise figure. This is our estimate.

16%22%+3.5
Coordinate aircraft and the command post.
Estimate

No public source provides a precise figure. This is our estimate.

14%28%+3.9
Get out whole and leave nobody behind.
Estimate

No public source provides a precise figure. This is our estimate.

14%10%+1.4
Total100%18%

Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low

Skills and activities

  • fight wildfires
  • cut line
  • lay hose
  • night watch
  • portable pump
  • air assets
  • fire-front map
  • spot fires

Sources for this job· O*NET 33-2022.00· ESCO/ISCO 5411

Railway engineer

Where the time goes

Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.

The time saving for each task is estimated separately.

TaskShareAIPoints
Track, geometry and the study.
Estimate

No public source provides a precise figure. This is our estimate.

16%40%+6.4
Points, the blade and the one that will not close.
Estimate

No public source provides a precise figure. This is our estimate.

18%14%+2.5
OLE, the height and the gauge.
Estimate

No public source provides a precise figure. This is our estimate.

16%28%+4.5
Works, the possession and not leaving the wire wrong.
Estimate

No public source provides a precise figure. This is our estimate.

16%22%+3.5
The operator, the rush and not jumping to a yes.
Estimate

No public source provides a precise figure. This is our estimate.

18%18%+3.2
That it does not derail, and not signing half-done points.
Estimate

No public source provides a precise figure. This is our estimate.

16%12%+1.9
Total100%22%

Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low

Skills and activities

  • track geometry
  • points
  • OLE
  • gauge
  • possessions
  • blades
  • railway studies
  • not jump to a yes

Sources for this job· O*NET 17-2051.00· ESCO/ISCO 2142

Analyse my job

Jobs with similar scores

  1. 661Forest ranger18%
  2. 662Aerial technician18%
  3. 663Varnisher18%
  4. 665Commercial diver18%
  5. 666Camera operator18%
  6. 667Bartender18%