Automation index
How much of a Wildland firefighter’s job can AI already do?
A fire-front map comes earlier. Going onto the slope with the wind against you do not.
This percentage does not predict how many people will lose their jobs.
Task comparison
IS WORK OVER?
Wildland firefighter
18%
AI can already do 18% of this job.
#564 / 643
View rankingWildland firefighter
Where the time goes
Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.
The time saving for each task is estimated separately.
| Task | Share | AI | Points |
|---|---|---|---|
Logs, map and the day’s attack plan.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 32% | +5.1 |
Line, hose-lay and the spot fire.EstimateNo public source provides a precise figure. This is our estimate. | 24% | 6% | +1.4 |
Tools, pump and the water that does not arrive.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 18% | +2.9 |
Night watch, lookout and the flare-up.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 22% | +3.5 |
Coordinate aircraft and the command post.EstimateNo public source provides a precise figure. This is our estimate. | 14% | 28% | +3.9 |
Get out whole and leave nobody behind.EstimateNo public source provides a precise figure. This is our estimate. | 14% | 10% | +1.4 |
| Total | 100% | 18% |
Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low
Skills and activities
- fight wildfires
- cut line
- lay hose
- night watch
- portable pump
- air assets
- fire-front map
- spot fires
Sources for this job· O*NET 33-2022.00· ESCO/ISCO 5411
IS WORK OVER?
Site reliability engineer
28%
#103 / 643
View rankingSite reliability engineer
Where the time goes
Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.
The time saving for each task is estimated separately.
| Task | Share | AI | Points |
|---|---|---|---|
SLOs, alerts and the runbook.EstimateNo public source provides a precise figure. This is our estimate. | 18% | 52% | +9.4 |
Incident, war room and not making it worse.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 22% | +3.5 |
CI/CD, capacity and the error budget.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 40% | +6.4 |
Postmortem, toil and automating the repeated.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 28% | +4.5 |
The product that wants to ship and the SLO that will not allow it.EstimateNo public source provides a precise figure. This is our estimate. | 18% | 14% | +2.5 |
Not taking production down, and signing the change.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 12% | +1.9 |
| Total | 100% | 28% |
Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low
Skills and activities
- SLOs
- runbooks
- handle incidents
- error budget
- autoscale
- postmortem
- reduce toil
- reliability CI/CD
Sources for this job· O*NET 15-1244.00· ESCO/ISCO 2512