Automation index
How much of a Window installer’s job can AI already do?
A measured opening comes earlier. Closing, insulating and not trapping the lintel do not.
This percentage does not predict how many people will lose their jobs.
Task comparison
IS WORK OVER?
Window installer
19%
AI can already do 19% of this job.
#512 / 643
View rankingWindow installer
Where the time goes
Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.
The time saving for each task is estimated separately.
| Task | Share | AI | Points |
|---|---|---|---|
Measure openings, subframe and the order.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 32% | +5.1 |
Set, plumb and the missing packer.EstimateNo public source provides a precise figure. This is our estimate. | 22% | 8% | +1.8 |
Foam, seal and the sweating lintel.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 22% | +3.5 |
Fittings, adjust and the sash that rubs.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 28% | +4.5 |
The lived-in house and not leaving the room freezing.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 18% | +2.9 |
That it closes, and not trapping the lintel.EstimateNo public source provides a precise figure. This is our estimate. | 14% | 12% | +1.7 |
| Total | 100% | 19% |
Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low
Skills and activities
- measure openings
- subframes
- plumb windows
- seal lintels
- adjust sashes
- foam
- packers
- window fittings
Sources for this job· O*NET 47-2121.00· ESCO/ISCO 7125
IS WORK OVER?
BIM modeller
28%
#109 / 643
View rankingBIM modeller
Where the time goes
Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.
The time saving for each task is estimated separately.
| Task | Share | AI | Points |
|---|---|---|---|
Model, families and clash detection.EstimateNo public source provides a precise figure. This is our estimate. | 18% | 52% | +9.4 |
IFC, BEP and trade coordination.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 40% | +6.4 |
Site, the one who will not open the model, and the meeting.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 22% | +3.5 |
Quantities, parameters and the 4D nobody uses.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 28% | +4.5 |
The last-minute change and not breaking the federated model.EstimateNo public source provides a precise figure. This is our estimate. | 18% | 14% | +2.5 |
That it can be built, and not over-modelling.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 12% | +1.9 |
| Total | 100% | 28% |
Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low
Skills and activities
- BIM modelling
- clash detection
- Revit families
- IFC
- BEP
- coordinate trades
- BIM quantities
- federated model
Sources for this job· O*NET 17-3011.00· ESCO/ISCO 3118