Automation index
How much of a Window installer’s job can AI already do?
A measured opening comes earlier. Closing, insulating and not trapping the lintel do not.
This percentage does not predict how many people will lose their jobs.
Task comparison
IS WORK OVER?
Window installer
19%
AI can already do 19% of this job.
#512 / 643
View rankingWindow installer
Where the time goes
Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.
The time saving for each task is estimated separately.
| Task | Share | AI | Points |
|---|---|---|---|
Measure openings, subframe and the order.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 32% | +5.1 |
Set, plumb and the missing packer.EstimateNo public source provides a precise figure. This is our estimate. | 22% | 8% | +1.8 |
Foam, seal and the sweating lintel.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 22% | +3.5 |
Fittings, adjust and the sash that rubs.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 28% | +4.5 |
The lived-in house and not leaving the room freezing.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 18% | +2.9 |
That it closes, and not trapping the lintel.EstimateNo public source provides a precise figure. This is our estimate. | 14% | 12% | +1.7 |
| Total | 100% | 19% |
Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low
Skills and activities
- measure openings
- subframes
- plumb windows
- seal lintels
- adjust sashes
- foam
- packers
- window fittings
Sources for this job· O*NET 47-2121.00· ESCO/ISCO 7125
IS WORK OVER?
Boiler technician
20%
#478 / 643
View rankingBoiler technician
Where the time goes
Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.
The time saving for each task is estimated separately.
| Task | Share | AI | Points |
|---|---|---|---|
Logs, fault codes and spares.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 35% | +5.6 |
Routes, appointments and permits.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 28% | +4.5 |
Diagnose, open and repair the boiler.EstimateNo public source provides a precise figure. This is our estimate. | 22% | 12% | +2.6 |
Tune-up, combustion and pressures.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 14% | +2.2 |
Clients, porters and plant-room access.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 15% | +2.4 |
Gas, safety and not leaving the building cold.EstimateNo public source provides a precise figure. This is our estimate. | 14% | 16% | +2.2 |
| Total | 100% | 19% |
Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low
Skills and activities
- Logs, fault codes and spares
- Routes, appointments and permits
- Diagnose, open and repair the boiler
- Tune-up, combustion and pressures
- Clients, porters and plant-room access
- calderas
- tecnico de calderas
- calefaccion central
Sources for this job· O*NET 49-9021.00· ESCO/ISCO 7126