Automation index
How much of a Window installer’s job can AI already do?
A measured opening comes earlier. Closing, insulating and not trapping the lintel do not.
This percentage does not predict how many people will lose their jobs.
Task comparison
IS WORK OVER?
Window installer
19%
AI can already do 19% of this job.
#502 / 633
View rankingWindow installer
Where the time goes
Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.
The time saving for each task is estimated separately.
| Task | Share | AI | Points |
|---|---|---|---|
Measure openings, subframe and the order.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 32% | +5.1 |
Set, plumb and the missing packer.EstimateNo public source provides a precise figure. This is our estimate. | 22% | 8% | +1.8 |
Foam, seal and the sweating lintel.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 22% | +3.5 |
Fittings, adjust and the sash that rubs.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 28% | +4.5 |
The lived-in house and not leaving the room freezing.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 18% | +2.9 |
That it closes, and not trapping the lintel.EstimateNo public source provides a precise figure. This is our estimate. | 14% | 12% | +1.7 |
| Total | 100% | 19% |
Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low
Skills and activities
- measure openings
- subframes
- plumb windows
- seal lintels
- adjust sashes
- foam
- packers
- window fittings
Sources for this job· O*NET 47-2121.00· ESCO/ISCO 7125
IS WORK OVER?
Cloud architect
28%
#82 / 633
View rankingCloud architect
Where the time goes
Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.
The time saving for each task is estimated separately.
| Task | Share | AI | Points |
|---|---|---|---|
Diagrams, ADRs and a first IaC pass.EstimateNo public source provides a precise figure. This is our estimate. | 22% | 48% | +10.6 |
Cost estimate, Well-Architected and gaps.EstimateNo public source provides a precise figure. This is our estimate. | 18% | 40% | +7.2 |
Review PRs, security and network.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 20% | +3.2 |
Align with security, finops and product.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 15% | +2.4 |
PoCs, real failures and vendor limits.EstimateNo public source provides a precise figure. This is our estimate. | 14% | 18% | +2.5 |
Sign the design and own the incident.EstimateNo public source provides a precise figure. This is our estimate. | 14% | 14% | +2 |
| Total | 100% | 28% |
Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low
Skills and activities
- building plans
- renders
- sign a project
- Diagrams, ADRs and a first IaC pass
- Cost estimate, Well-Architected and gaps
- Review PRs, security and network
- Align with security, finops and product
- PoCs, real failures and vendor limits
- Sign the design and own the incident
- arquitecto cloud
Sources for this job· O*NET 15-1243.01· ESCO/ISCO 2511