IS WORK OVER?

Automation index

How much of a Window installer’s job can AI already do?

A measured opening comes earlier. Closing, insulating and not trapping the lintel do not.

This percentage does not predict how many people will lose their jobs.

Task comparison

Window installer

Where the time goes

Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.

The time saving for each task is estimated separately.

TaskShareAIPoints
Measure openings, subframe and the order.
Estimate

No public source provides a precise figure. This is our estimate.

16%32%+5.1
Set, plumb and the missing packer.
Estimate

No public source provides a precise figure. This is our estimate.

22%8%+1.8
Foam, seal and the sweating lintel.
Estimate

No public source provides a precise figure. This is our estimate.

16%22%+3.5
Fittings, adjust and the sash that rubs.
Estimate

No public source provides a precise figure. This is our estimate.

16%28%+4.5
The lived-in house and not leaving the room freezing.
Estimate

No public source provides a precise figure. This is our estimate.

16%18%+2.9
That it closes, and not trapping the lintel.
Estimate

No public source provides a precise figure. This is our estimate.

14%12%+1.7
Total100%19%

Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low

Skills and activities

  • measure openings
  • subframes
  • plumb windows
  • seal lintels
  • adjust sashes
  • foam
  • packers
  • window fittings

Sources for this job· O*NET 47-2121.00· ESCO/ISCO 7125

Database administrator

Where the time goes

Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.

The time saving for each task is estimated separately.

TaskShareAIPoints
Tuning, indexes and execution plans.
Estimate

No public source provides a precise figure. This is our estimate.

22%48%+10.6
Backups, jobs and docs.
Estimate

No public source provides a precise figure. This is our estimate.

18%42%+7.6
Incidents, locks and restores.
Estimate

No public source provides a precise figure. This is our estimate.

16%20%+3.2
Schema changes with development.
Estimate

No public source provides a precise figure. This is our estimate.

16%15%+2.4
Permissions, audit and PII.
Estimate

No public source provides a precise figure. This is our estimate.

14%18%+2.5
Capacity, cost and engine choice.
Estimate

No public source provides a precise figure. This is our estimate.

14%16%+2.2
Total100%28%

Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low

Skills and activities

  • Tuning, indexes and execution plans
  • Backups, jobs and docs
  • Incidents, locks and restores
  • Schema changes with development
  • Permissions, audit and PII
  • Capacity, cost and engine choice
  • dba
  • administrador de base de datos
  • oracle dba

Sources for this job· O*NET 15-1242.00· ESCO/ISCO 2521

Analyse my job

Jobs with similar scores

  1. 499Farrier19%
  2. 500Blacksmith19%
  3. 501Shutter installer19%
  4. 503Diving instructor19%
  5. 504Climbing instructor19%
  6. 505Restaurant maître19%