Automation index
How much of a Window installer’s job can AI already do?
A measured opening comes earlier. Closing, insulating and not trapping the lintel do not.
This percentage does not predict how many people will lose their jobs.
Task comparison
IS WORK OVER?
Window installer
19%
AI can already do 19% of this job.
#512 / 643
View rankingWindow installer
Where the time goes
Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.
The time saving for each task is estimated separately.
| Task | Share | AI | Points |
|---|---|---|---|
Measure openings, subframe and the order.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 32% | +5.1 |
Set, plumb and the missing packer.EstimateNo public source provides a precise figure. This is our estimate. | 22% | 8% | +1.8 |
Foam, seal and the sweating lintel.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 22% | +3.5 |
Fittings, adjust and the sash that rubs.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 28% | +4.5 |
The lived-in house and not leaving the room freezing.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 18% | +2.9 |
That it closes, and not trapping the lintel.EstimateNo public source provides a precise figure. This is our estimate. | 14% | 12% | +1.7 |
| Total | 100% | 19% |
Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low
Skills and activities
- measure openings
- subframes
- plumb windows
- seal lintels
- adjust sashes
- foam
- packers
- window fittings
Sources for this job· O*NET 47-2121.00· ESCO/ISCO 7125
IS WORK OVER?
Harbour pilot
20%
#474 / 643
View rankingHarbour pilot
Where the time goes
Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.
The time saving for each task is estimated separately.
| Task | Share | AI | Points |
|---|---|---|---|
Chart, draught and the manoeuvre plan.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 36% | +5.8 |
Board, conning and the tug.EstimateNo public source provides a precise figure. This is our estimate. | 22% | 8% | +1.8 |
Wind, current and coming alongside.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 22% | +3.5 |
Pilotage, the master and not fighting the bridge.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 28% | +4.5 |
Fog, the closure and the yes or no to enter.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 18% | +2.9 |
Get it in whole, and not scraping the bottom.EstimateNo public source provides a precise figure. This is our estimate. | 14% | 10% | +1.4 |
| Total | 100% | 20% |
Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low
Skills and activities
- pilotage
- conning
- draughts
- tugs
- come alongside
- charts
- beam wind
- the basin
Sources for this job· O*NET 53-5021.00· ESCO/ISCO 3152