IS WORK OVER?

Automation index

How much of a Window installer’s job can AI already do?

A measured opening comes earlier. Closing, insulating and not trapping the lintel do not.

This percentage does not predict how many people will lose their jobs.

Task comparison

Window installer

Where the time goes

Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.

The time saving for each task is estimated separately.

TaskShareAIPoints
Measure openings, subframe and the order.
Estimate

No public source provides a precise figure. This is our estimate.

16%32%+5.1
Set, plumb and the missing packer.
Estimate

No public source provides a precise figure. This is our estimate.

22%8%+1.8
Foam, seal and the sweating lintel.
Estimate

No public source provides a precise figure. This is our estimate.

16%22%+3.5
Fittings, adjust and the sash that rubs.
Estimate

No public source provides a precise figure. This is our estimate.

16%28%+4.5
The lived-in house and not leaving the room freezing.
Estimate

No public source provides a precise figure. This is our estimate.

16%18%+2.9
That it closes, and not trapping the lintel.
Estimate

No public source provides a precise figure. This is our estimate.

14%12%+1.7
Total100%19%

Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low

Skills and activities

  • measure openings
  • subframes
  • plumb windows
  • seal lintels
  • adjust sashes
  • foam
  • packers
  • window fittings

Sources for this job· O*NET 47-2121.00· ESCO/ISCO 7125

PLC programmer

Where the time goes

Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.

The time saving for each task is estimated separately.

TaskShareAIPoints
Ladder, tags and the comment.
Estimate

No public source provides a precise figure. This is our estimate.

16%40%+6.4
Cell, the fault and the one that will not stop.
Estimate

No public source provides a precise figure. This is our estimate.

18%14%+2.5
E-stop, the cable and not jumping it.
Estimate

No public source provides a precise figure. This is our estimate.

16%28%+4.5
Recipe, the change and not dumping production.
Estimate

No public source provides a precise figure. This is our estimate.

16%22%+3.5
The electrician, the terminals and going down to see it.
Estimate

No public source provides a precise figure. This is our estimate.

18%18%+3.2
That it stops on a fault, and not jumping the e-stop.
Estimate

No public source provides a precise figure. This is our estimate.

16%12%+1.9
Total100%22%

Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low

Skills and activities

  • program PLCs
  • tags
  • e-stops
  • faults
  • recipes
  • terminals
  • program comments
  • not jump e-stops

Sources for this job· O*NET 15-1252.00· ESCO/ISCO 2514

Analyse my job

Jobs with similar scores

  1. 605Blacksmith19%
  2. 606Site engineer19%
  3. 607Shutter installer19%
  4. 609Diving instructor19%
  5. 610Climbing instructor19%
  6. 611Restaurant maître19%