Automation index
How much of a Window installer’s job can AI already do?
A measured opening comes earlier. Closing, insulating and not trapping the lintel do not.
This percentage does not predict how many people will lose their jobs.
Task comparison
IS WORK OVER?
Window installer
19%
AI can already do 19% of this job.
#502 / 633
View rankingWindow installer
Where the time goes
Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.
The time saving for each task is estimated separately.
| Task | Share | AI | Points |
|---|---|---|---|
Measure openings, subframe and the order.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 32% | +5.1 |
Set, plumb and the missing packer.EstimateNo public source provides a precise figure. This is our estimate. | 22% | 8% | +1.8 |
Foam, seal and the sweating lintel.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 22% | +3.5 |
Fittings, adjust and the sash that rubs.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 28% | +4.5 |
The lived-in house and not leaving the room freezing.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 18% | +2.9 |
That it closes, and not trapping the lintel.EstimateNo public source provides a precise figure. This is our estimate. | 14% | 12% | +1.7 |
| Total | 100% | 19% |
Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low
Skills and activities
- measure openings
- subframes
- plumb windows
- seal lintels
- adjust sashes
- foam
- packers
- window fittings
Sources for this job· O*NET 47-2121.00· ESCO/ISCO 7125
IS WORK OVER?
Power-plant operator
19%
#517 / 633
View rankingPower-plant operator
Where the time goes
Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.
The time saving for each task is estimated separately.
| Task | Share | AI | Points |
|---|---|---|---|
Set-point, parameters and the log.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 32% | +5.1 |
Room, alarms and the one that trips.EstimateNo public source provides a precise figure. This is our estimate. | 22% | 8% | +1.8 |
Start, stop and not skipping the SOP.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 22% | +3.5 |
Maintenance, isolation and the permit.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 28% | +4.5 |
The peak, the grid and not forcing it.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 18% | +2.9 |
The set-point, and not tripping.EstimateNo public source provides a precise figure. This is our estimate. | 14% | 12% | +1.7 |
| Total | 100% | 19% |
Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low
Skills and activities
- set-points
- control room
- plant SOP
- starts
- isolations
- alarms
- dispatch
- the grid
Sources for this job· O*NET 51-8013.00· ESCO/ISCO 3131