IS WORK OVER?

Automation index

How much of a Window installer’s job can AI already do?

A measured opening comes earlier. Closing, insulating and not trapping the lintel do not.

This percentage does not predict how many people will lose their jobs.

Task comparison

Window installer

Where the time goes

Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.

The time saving for each task is estimated separately.

TaskShareAIPoints
Measure openings, subframe and the order.
Estimate

No public source provides a precise figure. This is our estimate.

16%32%+5.1
Set, plumb and the missing packer.
Estimate

No public source provides a precise figure. This is our estimate.

22%8%+1.8
Foam, seal and the sweating lintel.
Estimate

No public source provides a precise figure. This is our estimate.

16%22%+3.5
Fittings, adjust and the sash that rubs.
Estimate

No public source provides a precise figure. This is our estimate.

16%28%+4.5
The lived-in house and not leaving the room freezing.
Estimate

No public source provides a precise figure. This is our estimate.

16%18%+2.9
That it closes, and not trapping the lintel.
Estimate

No public source provides a precise figure. This is our estimate.

14%12%+1.7
Total100%19%

Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low

Skills and activities

  • measure openings
  • subframes
  • plumb windows
  • seal lintels
  • adjust sashes
  • foam
  • packers
  • window fittings

Sources for this job· O*NET 47-2121.00· ESCO/ISCO 7125

Stevedore

Where the time goes

Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.

The time saving for each task is estimated separately.

TaskShareAIPoints
Stow plans, shifts and logs.
Estimate

No public source provides a precise figure. This is our estimate.

16%28%+4.5
Hook, guide and lash cargo.
Estimate

No public source provides a precise figure. This is our estimate.

24%8%+1.9
Quay, cranes and danger zones.
Estimate

No public source provides a precise figure. This is our estimate.

16%12%+1.9
Team, radio and foreman.
Estimate

No public source provides a precise figure. This is our estimate.

16%18%+2.9
Dangerous goods and checks.
Estimate

No public source provides a precise figure. This is our estimate.

14%22%+3.1
Not leaving a container badly lashed.
Estimate

No public source provides a precise figure. This is our estimate.

14%14%+2
Total100%16%

Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low

Skills and activities

  • Stow plans, shifts and logs
  • Hook, guide and lash cargo
  • Quay, cranes and danger zones
  • Team, radio and foreman
  • Dangerous goods and checks
  • Not leaving a container badly lashed
  • estibador
  • estiba
  • stevedore

Sources for this job· O*NET 53-7062.00· ESCO/ISCO 9333

Analyse my job

Jobs with similar scores

  1. 509Farrier19%
  2. 510Blacksmith19%
  3. 511Shutter installer19%
  4. 513Diving instructor19%
  5. 514Climbing instructor19%
  6. 515Restaurant maître19%