IS WORK OVER?

Automation index

How much of a Window installer’s job can AI already do?

A measured opening comes earlier. Closing, insulating and not trapping the lintel do not.

This percentage does not predict how many people will lose their jobs.

Task comparison

Window installer

Where the time goes

Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.

The time saving for each task is estimated separately.

TaskShareAIPoints
Measure openings, subframe and the order.
Estimate

No public source provides a precise figure. This is our estimate.

16%32%+5.1
Set, plumb and the missing packer.
Estimate

No public source provides a precise figure. This is our estimate.

22%8%+1.8
Foam, seal and the sweating lintel.
Estimate

No public source provides a precise figure. This is our estimate.

16%22%+3.5
Fittings, adjust and the sash that rubs.
Estimate

No public source provides a precise figure. This is our estimate.

16%28%+4.5
The lived-in house and not leaving the room freezing.
Estimate

No public source provides a precise figure. This is our estimate.

16%18%+2.9
That it closes, and not trapping the lintel.
Estimate

No public source provides a precise figure. This is our estimate.

14%12%+1.7
Total100%19%

Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low

Skills and activities

  • measure openings
  • subframes
  • plumb windows
  • seal lintels
  • adjust sashes
  • foam
  • packers
  • window fittings

Sources for this job· O*NET 47-2121.00· ESCO/ISCO 7125

Train conductor

Where the time goes

Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.

The time saving for each task is estimated separately.

TaskShareAIPoints
Consist, brakes and the departure sheet.
Estimate

No public source provides a precise figure. This is our estimate.

16%36%+5.8
Platform, close-up and the one left outside.
Estimate

No public source provides a precise figure. This is our estimate.

18%12%+2.2
Incidents, Control and the delay.
Estimate

No public source provides a precise figure. This is our estimate.

16%28%+4.5
Ticket staff, the fare dodger and the clash.
Estimate

No public source provides a precise figure. This is our estimate.

16%22%+3.5
The line, the points and not leaving early.
Estimate

No public source provides a precise figure. This is our estimate.

18%18%+3.2
Leave nobody behind, and sign the consist.
Estimate

No public source provides a precise figure. This is our estimate.

16%12%+1.9
Total100%21%

Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low

Skills and activities

  • train consist
  • platform close-up
  • departure sheet
  • Control
  • brake check
  • line incidents
  • halts
  • delays

Sources for this job· O*NET 53-4031.00· ESCO/ISCO 8312

Analyse my job

Jobs with similar scores

  1. 499Farrier19%
  2. 500Blacksmith19%
  3. 501Shutter installer19%
  4. 503Diving instructor19%
  5. 504Climbing instructor19%
  6. 505Restaurant maître19%