IS WORK OVER?

Automation index

How much of a Wind-turbine technician’s job can AI already do?

A farm SCADA comes earlier. Climbing, repairing and coming down whole do not.

This percentage does not predict how many people will lose their jobs.

Task comparison

Wind-turbine technician

Where the time goes

Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.

The time saving for each task is estimated separately.

TaskShareAIPoints
SCADA, the code and the spare.
Estimate

No public source provides a precise figure. This is our estimate.

16%32%+5.1
Climb, the wind and the one who is sick.
Estimate

No public source provides a precise figure. This is our estimate.

22%8%+1.8
Nacelle, the oil and the one that will not close.
Estimate

No public source provides a precise figure. This is our estimate.

16%22%+3.5
Rescue, the protocol and not improvising.
Estimate

No public source provides a precise figure. This is our estimate.

16%28%+4.5
The storm, the access and aborting.
Estimate

No public source provides a precise figure. This is our estimate.

16%18%+2.9
Come down whole, and the turbine running.
Estimate

No public source provides a precise figure. This is our estimate.

14%12%+1.7
Total100%19%

Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low

Skills and activities

  • farm SCADA
  • climb the tower
  • nacelle
  • height rescue
  • oils
  • fault codes
  • access
  • wind

Sources for this job· O*NET 49-9081.00· ESCO/ISCO 7412

Bellhop

Where the time goes

Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.

The time saving for each task is estimated separately.

TaskShareAIPoints
Tag, bags and the floor map.
Estimate

No public source provides a precise figure. This is our estimate.

16%32%+5.1
Up, the lift and the one that will not fit.
Estimate

No public source provides a precise figure. This is our estimate.

22%8%+1.8
Room, the VIP and not going in unannounced.
Estimate

No public source provides a precise figure. This is our estimate.

16%22%+3.5
Tip, the shift and the one who hides.
Estimate

No public source provides a precise figure. This is our estimate.

16%28%+4.5
The group, the coach and not leaving one in the lobby.
Estimate

No public source provides a precise figure. This is our estimate.

16%18%+2.9
Whole, and not losing the one at the back.
Estimate

No public source provides a precise figure. This is our estimate.

14%12%+1.7
Total100%19%

Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low

Skills and activities

  • bags
  • floors
  • the lift
  • VIP
  • tips
  • lobby
  • groups
  • luggage tags

Sources for this job· O*NET 43-4081.00· ESCO/ISCO 9621

Analyse my job

Jobs with similar scores

  1. 543Milliner19%
  2. 544Well driller19%
  3. 545Woodcarver19%
  4. 547Battery technician19%
  5. 548Biogas technician19%
  6. 549Hydrogen technician19%