IS WORK OVER?

Automation index

How much of a Wind-turbine technician’s job can AI already do?

A farm SCADA comes earlier. Climbing, repairing and coming down whole do not.

This percentage does not predict how many people will lose their jobs.

Task comparison

Wind-turbine technician

Where the time goes

Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.

The time saving for each task is estimated separately.

TaskShareAIPoints
SCADA, the code and the spare.
Estimate

No public source provides a precise figure. This is our estimate.

16%32%+5.1
Climb, the wind and the one who is sick.
Estimate

No public source provides a precise figure. This is our estimate.

22%8%+1.8
Nacelle, the oil and the one that will not close.
Estimate

No public source provides a precise figure. This is our estimate.

16%22%+3.5
Rescue, the protocol and not improvising.
Estimate

No public source provides a precise figure. This is our estimate.

16%28%+4.5
The storm, the access and aborting.
Estimate

No public source provides a precise figure. This is our estimate.

16%18%+2.9
Come down whole, and the turbine running.
Estimate

No public source provides a precise figure. This is our estimate.

14%12%+1.7
Total100%19%

Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low

Skills and activities

  • farm SCADA
  • climb the tower
  • nacelle
  • height rescue
  • oils
  • fault codes
  • access
  • wind

Sources for this job· O*NET 49-9081.00· ESCO/ISCO 7412

Bridge engineer

Where the time goes

Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.

The time saving for each task is estimated separately.

TaskShareAIPoints
Model, loads and the span.
Estimate

No public source provides a precise figure. This is our estimate.

16%40%+6.4
Works, the prestress and the one who did not tension.
Estimate

No public source provides a precise figure. This is our estimate.

18%14%+2.5
Inspection, the crack and not looking away.
Estimate

No public source provides a precise figure. This is our estimate.

16%28%+4.5
Traffic, the closure and not leaving the village hanging.
Estimate

No public source provides a precise figure. This is our estimate.

16%22%+3.5
The contractor, the rush and not jumping to a yes.
Estimate

No public source provides a precise figure. This is our estimate.

18%18%+3.2
That it takes the lorry, and not signing the crack.
Estimate

No public source provides a precise figure. This is our estimate.

16%12%+1.9
Total100%22%

Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low

Skills and activities

  • spans
  • prestress
  • cracks
  • bridge inspection
  • loads
  • traffic closures
  • structural models
  • tensioning

Sources for this job· O*NET 17-2051.00· ESCO/ISCO 2142

Analyse my job

Jobs with similar scores

  1. 636Milliner19%
  2. 637Well driller19%
  3. 638Woodcarver19%
  4. 640Histology technician19%
  5. 641Battery technician19%
  6. 642Biogas technician19%