IS WORK OVER?

Automation index

How much of a Wind-turbine technician’s job can AI already do?

A farm SCADA comes earlier. Climbing, repairing and coming down whole do not.

This percentage does not predict how many people will lose their jobs.

Task comparison

Wind-turbine technician

Where the time goes

Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.

The time saving for each task is estimated separately.

TaskShareAIPoints
SCADA, the code and the spare.
Estimate

No public source provides a precise figure. This is our estimate.

16%32%+5.1
Climb, the wind and the one who is sick.
Estimate

No public source provides a precise figure. This is our estimate.

22%8%+1.8
Nacelle, the oil and the one that will not close.
Estimate

No public source provides a precise figure. This is our estimate.

16%22%+3.5
Rescue, the protocol and not improvising.
Estimate

No public source provides a precise figure. This is our estimate.

16%28%+4.5
The storm, the access and aborting.
Estimate

No public source provides a precise figure. This is our estimate.

16%18%+2.9
Come down whole, and the turbine running.
Estimate

No public source provides a precise figure. This is our estimate.

14%12%+1.7
Total100%19%

Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low

Skills and activities

  • farm SCADA
  • climb the tower
  • nacelle
  • height rescue
  • oils
  • fault codes
  • access
  • wind

Sources for this job· O*NET 49-9081.00· ESCO/ISCO 7412

Order picker

Where the time goes

Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.

The time saving for each task is estimated separately.

TaskShareAIPoints
List, location and the scan.
Estimate

No public source provides a precise figure. This is our estimate.

16%48%+7.7
Aisle, height and the parcel that will not fit.
Estimate

No public source provides a precise figure. This is our estimate.

22%10%+2.2
Errors, the short and calling it.
Estimate

No public source provides a precise figure. This is our estimate.

16%28%+4.5
Pace, the shift and the pallet that goes.
Estimate

No public source provides a precise figure. This is our estimate.

16%22%+3.5
Peaks, Black Friday and not mixing orders.
Estimate

No public source provides a precise figure. This is our estimate.

16%18%+2.9
Hit the SKU, and not leaving a lame pallet.
Estimate

No public source provides a precise figure. This is our estimate.

14%12%+1.7
Total100%22%

Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low

Skills and activities

  • picking
  • scan locations
  • shorts
  • build pallets
  • warehouse aisles
  • order peaks
  • SKUs
  • voice picking

Sources for this job· O*NET 53-7062.00· ESCO/ISCO 4321

Analyse my job

Jobs with similar scores

  1. 533Milliner19%
  2. 534Well driller19%
  3. 535Woodcarver19%
  4. 537Battery technician19%
  5. 538Biogas technician19%
  6. 539Hydrogen technician19%