IS WORK OVER?

Automation index

How much of a Wind-turbine technician’s job can AI already do?

A farm SCADA comes earlier. Climbing, repairing and coming down whole do not.

This percentage does not predict how many people will lose their jobs.

Task comparison

Wind-turbine technician

Where the time goes

Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.

The time saving for each task is estimated separately.

TaskShareAIPoints
SCADA, the code and the spare.
Estimate

No public source provides a precise figure. This is our estimate.

16%32%+5.1
Climb, the wind and the one who is sick.
Estimate

No public source provides a precise figure. This is our estimate.

22%8%+1.8
Nacelle, the oil and the one that will not close.
Estimate

No public source provides a precise figure. This is our estimate.

16%22%+3.5
Rescue, the protocol and not improvising.
Estimate

No public source provides a precise figure. This is our estimate.

16%28%+4.5
The storm, the access and aborting.
Estimate

No public source provides a precise figure. This is our estimate.

16%18%+2.9
Come down whole, and the turbine running.
Estimate

No public source provides a precise figure. This is our estimate.

14%12%+1.7
Total100%19%

Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low

Skills and activities

  • farm SCADA
  • climb the tower
  • nacelle
  • height rescue
  • oils
  • fault codes
  • access
  • wind

Sources for this job· O*NET 49-9081.00· ESCO/ISCO 7412

Quality engineer

Where the time goes

Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.

The time saving for each task is estimated separately.

TaskShareAIPoints
FMEA, control plan and the limits.
Estimate

No public source provides a precise figure. This is our estimate.

18%48%+8.6
8D, claims and the supplier.
Estimate

No public source provides a precise figure. This is our estimate.

16%40%+6.4
Audit, IATF and the awkward finding.
Estimate

No public source provides a precise figure. This is our estimate.

16%22%+3.5
The line, the defect and stop or not.
Estimate

No public source provides a precise figure. This is our estimate.

18%18%+3.2
APQP, PPAP and the customer launch.
Estimate

No public source provides a precise figure. This is our estimate.

16%28%+4.5
Release with judgement, and not hiding the PPM.
Estimate

No public source provides a precise figure. This is our estimate.

16%14%+2.2
Total100%28%

Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low

Skills and activities

  • FMEA
  • 8D
  • control plan
  • IATF
  • PPAP
  • APQP
  • supplier claims
  • release batches

Sources for this job· O*NET 17-2112.00· ESCO/ISCO 2141

Analyse my job

Jobs with similar scores

  1. 543Milliner19%
  2. 544Well driller19%
  3. 545Woodcarver19%
  4. 547Battery technician19%
  5. 548Biogas technician19%
  6. 549Hydrogen technician19%