IS WORK OVER?

Automation index

How much of a Woodcarver’s job can AI already do?

A drawing on the block comes earlier. Getting the form without over-cutting do not.

This percentage does not predict how many people will lose their jobs.

Task comparison

Woodcarver

Where the time goes

Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.

The time saving for each task is estimated separately.

TaskShareAIPoints
Drawing, grain and the block.
Estimate

No public source provides a precise figure. This is our estimate.

16%32%+5.1
Gouge, take and the one that splits.
Estimate

No public source provides a precise figure. This is our estimate.

22%8%+1.8
Sand, finish and the fine detail.
Estimate

No public source provides a precise figure. This is our estimate.

16%22%+3.5
Order, the altarpiece and the church deadline.
Estimate

No public source provides a precise figure. This is our estimate.

16%28%+4.5
The grain, the knot and not going against it.
Estimate

No public source provides a precise figure. This is our estimate.

16%18%+2.9
The form, and not over-cutting.
Estimate

No public source provides a precise figure. This is our estimate.

14%12%+1.7
Total100%19%

Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low

Skills and activities

  • gouges
  • grain
  • blocks
  • altarpieces
  • sanding
  • detail
  • knots
  • draw on wood

Sources for this job· O*NET 51-7099.00· ESCO/ISCO 7317

Bridge engineer

Where the time goes

Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.

The time saving for each task is estimated separately.

TaskShareAIPoints
Model, loads and the span.
Estimate

No public source provides a precise figure. This is our estimate.

16%40%+6.4
Works, the prestress and the one who did not tension.
Estimate

No public source provides a precise figure. This is our estimate.

18%14%+2.5
Inspection, the crack and not looking away.
Estimate

No public source provides a precise figure. This is our estimate.

16%28%+4.5
Traffic, the closure and not leaving the village hanging.
Estimate

No public source provides a precise figure. This is our estimate.

16%22%+3.5
The contractor, the rush and not jumping to a yes.
Estimate

No public source provides a precise figure. This is our estimate.

18%18%+3.2
That it takes the lorry, and not signing the crack.
Estimate

No public source provides a precise figure. This is our estimate.

16%12%+1.9
Total100%22%

Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low

Skills and activities

  • spans
  • prestress
  • cracks
  • bridge inspection
  • loads
  • traffic closures
  • structural models
  • tensioning

Sources for this job· O*NET 17-2051.00· ESCO/ISCO 2142

Analyse my job

Jobs with similar scores

  1. 635Tailor19%
  2. 636Milliner19%
  3. 637Well driller19%
  4. 639Wind-turbine technician19%
  5. 640Histology technician19%
  6. 641Battery technician19%