IS WORK OVER?

Automation index

How much of a Woodcarver’s job can AI already do?

A drawing on the block comes earlier. Getting the form without over-cutting do not.

This percentage does not predict how many people will lose their jobs.

Task comparison

Woodcarver

Where the time goes

Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.

The time saving for each task is estimated separately.

TaskShareAIPoints
Drawing, grain and the block.
Estimate

No public source provides a precise figure. This is our estimate.

16%32%+5.1
Gouge, take and the one that splits.
Estimate

No public source provides a precise figure. This is our estimate.

22%8%+1.8
Sand, finish and the fine detail.
Estimate

No public source provides a precise figure. This is our estimate.

16%22%+3.5
Order, the altarpiece and the church deadline.
Estimate

No public source provides a precise figure. This is our estimate.

16%28%+4.5
The grain, the knot and not going against it.
Estimate

No public source provides a precise figure. This is our estimate.

16%18%+2.9
The form, and not over-cutting.
Estimate

No public source provides a precise figure. This is our estimate.

14%12%+1.7
Total100%19%

Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low

Skills and activities

  • gouges
  • grain
  • blocks
  • altarpieces
  • sanding
  • detail
  • knots
  • draw on wood

Sources for this job· O*NET 51-7099.00· ESCO/ISCO 7317

Excavator operator

Where the time goes

Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.

The time saving for each task is estimated separately.

TaskShareAIPoints
Set-out, levels and the machine log.
Estimate

No public source provides a precise figure. This is our estimate.

16%32%+5.1
Dig, load and the batter that comes in.
Estimate

No public source provides a precise figure. This is our estimate.

24%6%+1.4
Services, the blind pipe and stopping in time.
Estimate

No public source provides a precise figure. This is our estimate.

16%22%+3.5
Maintenance, grease and the pin that snaps.
Estimate

No public source provides a precise figure. This is our estimate.

16%28%+4.5
The labourer, the lorry and covering nobody.
Estimate

No public source provides a precise figure. This is our estimate.

14%18%+2.5
Not breaking what is buried, and leaving a clean formation.
Estimate

No public source provides a precise figure. This is our estimate.

14%10%+1.4
Total100%18%

Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low

Skills and activities

  • dig with excavator
  • load lorries
  • batters
  • buried services
  • set-out levels
  • grease the machine
  • formation
  • site GPS

Sources for this job· O*NET 47-2073.00· ESCO/ISCO 8342

Analyse my job

Jobs with similar scores

  1. 542Tailor19%
  2. 543Milliner19%
  3. 544Well driller19%
  4. 546Wind-turbine technician19%
  5. 547Battery technician19%
  6. 548Biogas technician19%