IS WORK OVER?

Automation index

How much of a Woodcarver’s job can AI already do?

A drawing on the block comes earlier. Getting the form without over-cutting do not.

This percentage does not predict how many people will lose their jobs.

Task comparison

Woodcarver

Where the time goes

Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.

The time saving for each task is estimated separately.

TaskShareAIPoints
Drawing, grain and the block.
Estimate

No public source provides a precise figure. This is our estimate.

16%32%+5.1
Gouge, take and the one that splits.
Estimate

No public source provides a precise figure. This is our estimate.

22%8%+1.8
Sand, finish and the fine detail.
Estimate

No public source provides a precise figure. This is our estimate.

16%22%+3.5
Order, the altarpiece and the church deadline.
Estimate

No public source provides a precise figure. This is our estimate.

16%28%+4.5
The grain, the knot and not going against it.
Estimate

No public source provides a precise figure. This is our estimate.

16%18%+2.9
The form, and not over-cutting.
Estimate

No public source provides a precise figure. This is our estimate.

14%12%+1.7
Total100%19%

Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low

Skills and activities

  • gouges
  • grain
  • blocks
  • altarpieces
  • sanding
  • detail
  • knots
  • draw on wood

Sources for this job· O*NET 51-7099.00· ESCO/ISCO 7317

Tram driver

Where the time goes

Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.

The time saving for each task is estimated separately.

TaskShareAIPoints
Checks, log and the cab.
Estimate

No public source provides a precise figure. This is our estimate.

16%32%+5.1
Drive, stops and the pedestrian who steps out.
Estimate

No public source provides a precise figure. This is our estimate.

24%8%+1.9
Badly parked car, calls and Control.
Estimate

No public source provides a precise figure. This is our estimate.

16%22%+3.5
Timetable, reliefs and rush hour.
Estimate

No public source provides a precise figure. This is our estimate.

16%28%+4.5
The tourist, the bike and not over-hooting.
Estimate

No public source provides a precise figure. This is our estimate.

14%18%+2.5
Hit nobody, and make the terminus.
Estimate

No public source provides a precise figure. This is our estimate.

14%12%+1.7
Total100%19%

Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low

Skills and activities

  • drive trams
  • urban stops
  • pedestrians
  • badly parked cars
  • Control
  • rush hour
  • cab checks
  • terminus

Sources for this job· O*NET 53-4041.00· ESCO/ISCO 8311

Analyse my job

Jobs with similar scores

  1. 542Tailor19%
  2. 543Milliner19%
  3. 544Well driller19%
  4. 546Wind-turbine technician19%
  5. 547Battery technician19%
  6. 548Biogas technician19%