Automation index
How much of a Workshop teacher’s job can AI already do?
A practical sheet comes earlier. Making the piece without cutting themselves do not.
This percentage does not predict how many people will lose their jobs.
Task comparison
IS WORK OVER?
Workshop teacher
19%
AI can already do 19% of this job.
#625 / 763
View rankingWorkshop teacher
Where the time goes
Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.
The time saving for each task is estimated separately.
| Task | Share | AI | Points |
|---|---|---|---|
Sheet, material and the station.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 32% | +5.1 |
Shop, the machine and the one without glasses.EstimateNo public source provides a precise figure. This is our estimate. | 22% | 8% | +1.8 |
The piece, the error and doing it again.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 22% | +3.5 |
Assess, the portfolio and not giving the pass away.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 28% | +4.5 |
The firm, the placement and the one who does not fit.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 18% | +2.9 |
The piece made, and no cuts.EstimateNo public source provides a precise figure. This is our estimate. | 14% | 12% | +1.7 |
| Total | 100% | 19% |
Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low
Skills and activities
- practical sheets
- shop machines
- glasses
- portfolio
- firm placements
- shop stations
- shop safety
- pieces
Sources for this job· O*NET 25-2032.00· ESCO/ISCO 2320
IS WORK OVER?
Facilities engineer
22%
#401 / 763
View rankingFacilities engineer
Where the time goes
Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.
The time saving for each task is estimated separately.
| Task | Share | AI | Points |
|---|---|---|---|
CMMS, tickets and the PPM.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 40% | +6.4 |
Roof, the chiller and the one that will not start.EstimateNo public source provides a precise figure. This is our estimate. | 18% | 14% | +2.5 |
Generator, the diesel and not leaving it dry.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 28% | +4.5 |
Fire, the pump and the monthly test.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 22% | +3.5 |
The tenant, August and not jumping to a yes.EstimateNo public source provides a precise figure. This is our estimate. | 18% | 18% | +3.2 |
That cooling does not die, and not leaving the generator dry.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 12% | +1.9 |
| Total | 100% | 22% |
Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low
Skills and activities
- CMMS
- PPM
- chillers
- generators
- diesel
- fire pumps
- roofs
- tickets
Sources for this job· O*NET 17-2199.00· ESCO/ISCO 2149