IS WORK OVER?

Automation index

How much of a Workshop teacher’s job can AI already do?

A practical sheet comes earlier. Making the piece without cutting themselves do not.

This percentage does not predict how many people will lose their jobs.

Task comparison

Workshop teacher

Where the time goes

Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.

The time saving for each task is estimated separately.

TaskShareAIPoints
Sheet, material and the station.
Estimate

No public source provides a precise figure. This is our estimate.

16%32%+5.1
Shop, the machine and the one without glasses.
Estimate

No public source provides a precise figure. This is our estimate.

22%8%+1.8
The piece, the error and doing it again.
Estimate

No public source provides a precise figure. This is our estimate.

16%22%+3.5
Assess, the portfolio and not giving the pass away.
Estimate

No public source provides a precise figure. This is our estimate.

16%28%+4.5
The firm, the placement and the one who does not fit.
Estimate

No public source provides a precise figure. This is our estimate.

16%18%+2.9
The piece made, and no cuts.
Estimate

No public source provides a precise figure. This is our estimate.

14%12%+1.7
Total100%19%

Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low

Skills and activities

  • practical sheets
  • shop machines
  • glasses
  • portfolio
  • firm placements
  • shop stations
  • shop safety
  • pieces

Sources for this job· O*NET 25-2032.00· ESCO/ISCO 2320

Geomatics engineer

Where the time goes

Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.

The time saving for each task is estimated separately.

TaskShareAIPoints
Station, the base and the cloud.
Estimate

No public source provides a precise figure. This is our estimate.

16%40%+6.4
Field, the axis and the one that moved.
Estimate

No public source provides a precise figure. This is our estimate.

18%14%+2.5
Model, the drift and not hiding metres.
Estimate

No public source provides a precise figure. This is our estimate.

16%28%+4.5
Works, the setting-out and going down to see it.
Estimate

No public source provides a precise figure. This is our estimate.

16%22%+3.5
The contractor, the rush and not signing the drift.
Estimate

No public source provides a precise figure. This is our estimate.

18%18%+3.2
That the axis is there, and not signing metres.
Estimate

No public source provides a precise figure. This is our estimate.

16%12%+1.9
Total100%22%

Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low

Skills and activities

  • point clouds
  • total stations
  • axes
  • setting-out
  • drift
  • bases
  • geomatics
  • the field

Sources for this job· O*NET 17-1022.00· ESCO/ISCO 2165

Analyse my job

Jobs with similar scores

  1. 612Judge19%
  2. 613Speech therapist19%
  3. 614Luthier19%
  4. 616Dressmaker19%
  5. 617Camp counsellor19%
  6. 618Ski instructor19%