IS WORK OVER?

Automation index

How much of a Yacht skipper’s job can AI already do?

A leisure course comes earlier. Bringing friends and boat whole do not.

This percentage does not predict how many people will lose their jobs.

Task comparison

Yacht skipper

Where the time goes

Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.

The time saving for each task is estimated separately.

TaskShareAIPoints
Course, weather and the day’s plan.
Estimate

No public source provides a precise figure. This is our estimate.

16%32%+5.1
Helm, the sea and the manoeuvre.
Estimate

No public source provides a precise figure. This is our estimate.

22%8%+1.8
Crew, the sick one and the novice.
Estimate

No public source provides a precise figure. This is our estimate.

16%22%+3.5
Breakdown, sail or engine and the call.
Estimate

No public source provides a precise figure. This is our estimate.

16%28%+4.5
The charter, the client and not pushing it.
Estimate

No public source provides a precise figure. This is our estimate.

16%18%+2.9
Whole into harbour, and not trusting the plotter.
Estimate

No public source provides a precise figure. This is our estimate.

14%12%+1.7
Total100%19%

Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low

Skills and activities

  • leisure course
  • helm
  • weather
  • harbour manoeuvre
  • novices
  • yacht charter
  • breakdowns
  • plotter

Sources for this job· O*NET 53-5021.00· ESCO/ISCO 3152

CNC machinist

Where the time goes

Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.

The time saving for each task is estimated separately.

TaskShareAIPoints
Program, simulate and document the cycle.
Estimate

No public source provides a precise figure. This is our estimate.

20%45%+9
Work orders, paper metrology and batches.
Estimate

No public source provides a precise figure. This is our estimate.

16%32%+5.1
Set up, set zeros and start.
Estimate

No public source provides a precise figure. This is our estimate.

20%14%+2.8
Measure, adjust and not break a tool.
Estimate

No public source provides a precise figure. This is our estimate.

16%18%+2.9
Maintenance, swarf and safety.
Estimate

No public source provides a precise figure. This is our estimate.

14%16%+2.2
Talk to engineering when the drawing lies.
Estimate

No public source provides a precise figure. This is our estimate.

14%15%+2.1
Total100%24%

Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low

Skills and activities

  • Program, simulate and document the cycle
  • Work orders, paper metrology and batches
  • Set up, set zeros and start
  • Measure, adjust and not break a tool
  • Maintenance, swarf and safety
  • Talk to engineering when the drawing lies
  • cnc
  • operario cnc
  • fresador
  • tornero cnc

Sources for this job· O*NET 51-4041.00· ESCO/ISCO 7223

Analyse my job

Jobs with similar scores

  1. 532Recycling-plant operator19%
  2. 533Organ builder19%
  3. 534Palaeontologist19%
  4. 536Paver19%
  5. 537Pet groomer19%
  6. 538Airline pilot19%