Automation index
How much of a Yacht skipper’s job can AI already do?
A leisure course comes earlier. Bringing friends and boat whole do not.
This percentage does not predict how many people will lose their jobs.
Task comparison
IS WORK OVER?
Yacht skipper
19%
AI can already do 19% of this job.
#624 / 743
View rankingYacht skipper
Where the time goes
Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.
The time saving for each task is estimated separately.
| Task | Share | AI | Points |
|---|---|---|---|
Course, weather and the day’s plan.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 32% | +5.1 |
Helm, the sea and the manoeuvre.EstimateNo public source provides a precise figure. This is our estimate. | 22% | 8% | +1.8 |
Crew, the sick one and the novice.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 22% | +3.5 |
Breakdown, sail or engine and the call.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 28% | +4.5 |
The charter, the client and not pushing it.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 18% | +2.9 |
Whole into harbour, and not trusting the plotter.EstimateNo public source provides a precise figure. This is our estimate. | 14% | 12% | +1.7 |
| Total | 100% | 19% |
Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low
Skills and activities
- leisure course
- helm
- weather
- harbour manoeuvre
- novices
- yacht charter
- breakdowns
- plotter
Sources for this job· O*NET 53-5021.00· ESCO/ISCO 3152
IS WORK OVER?
Railway engineer
22%
#396 / 743
View rankingRailway engineer
Where the time goes
Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.
The time saving for each task is estimated separately.
| Task | Share | AI | Points |
|---|---|---|---|
Track, geometry and the study.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 40% | +6.4 |
Points, the blade and the one that will not close.EstimateNo public source provides a precise figure. This is our estimate. | 18% | 14% | +2.5 |
OLE, the height and the gauge.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 28% | +4.5 |
Works, the possession and not leaving the wire wrong.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 22% | +3.5 |
The operator, the rush and not jumping to a yes.EstimateNo public source provides a precise figure. This is our estimate. | 18% | 18% | +3.2 |
That it does not derail, and not signing half-done points.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 12% | +1.9 |
| Total | 100% | 22% |
Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low
Skills and activities
- track geometry
- points
- OLE
- gauge
- possessions
- blades
- railway studies
- not jump to a yes
Sources for this job· O*NET 17-2051.00· ESCO/ISCO 2142