IS WORK OVER?

Automation index

How much of a Zookeeper’s job can AI already do?

An enclosure protocol comes earlier. Going in, feeding and not losing an animal do not.

This percentage does not predict how many people will lose their jobs.

Task comparison

Zookeeper

Where the time goes

Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.

The time saving for each task is estimated separately.

TaskShareAIPoints
Protocol, ration and the enclosure log.
Estimate

No public source provides a precise figure. This is our estimate.

16%32%+5.1
Go in, clean and the one that will not come off.
Estimate

No public source provides a precise figure. This is our estimate.

22%8%+1.8
Enrichment, the public and not teaching badly.
Estimate

No public source provides a precise figure. This is our estimate.

16%22%+3.5
Vet, the sign and calling it in time.
Estimate

No public source provides a precise figure. This is our estimate.

16%28%+4.5
Escape, the protocol and not improvising.
Estimate

No public source provides a precise figure. This is our estimate.

16%18%+2.9
Not losing an animal, and not skipping the lock.
Estimate

No public source provides a precise figure. This is our estimate.

14%12%+1.7
Total100%19%

Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low

Skills and activities

  • enclosures
  • zoo rations
  • enrichment
  • escape protocol
  • vet log
  • lock-up
  • enclosure clean
  • the public

Sources for this job· O*NET 39-2021.00· ESCO/ISCO 5164

Electronics engineer

Where the time goes

Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.

The time saving for each task is estimated separately.

TaskShareAIPoints
Schematic, simulation and PCB layout.
Estimate

No public source provides a precise figure. This is our estimate.

18%48%+8.6
Firmware, tests and bench.
Estimate

No public source provides a precise figure. This is our estimate.

16%32%+5.1
Vendors, prototypes and certifications.
Estimate

No public source provides a precise figure. This is our estimate.

16%22%+3.5
Debug EMC and field faults.
Estimate

No public source provides a precise figure. This is our estimate.

16%18%+2.9
Documentation, versioning and quality.
Estimate

No public source provides a precise figure. This is our estimate.

18%16%+2.9
Not sending a blind board to manufacture.
Estimate

No public source provides a precise figure. This is our estimate.

16%14%+2.2
Total100%25%

Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low

Skills and activities

  • Schematic, simulation and PCB layout
  • Firmware, tests and bench
  • Vendors, prototypes and certifications
  • Debug EMC and field faults
  • Documentation, versioning and quality
  • Not sending a blind board to manufacture
  • ingeniero electronico
  • electronics engineer

Sources for this job· O*NET 17-2072.00· ESCO/ISCO 2152

Analyse my job

Jobs with similar scores

  1. 486Metro driver19%
  2. 487Tram driver19%
  3. 488Ham carver19%
  4. 490Chimney sweep19%
  5. 491Film director19%
  6. 492Gilder19%