Automation index
How much of a Zookeeper’s job can AI already do?
An enclosure protocol comes earlier. Going in, feeding and not losing an animal do not.
This percentage does not predict how many people will lose their jobs.
Task comparison
IS WORK OVER?
Zookeeper
19%
AI can already do 19% of this job.
#588 / 753
View rankingZookeeper
Where the time goes
Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.
The time saving for each task is estimated separately.
| Task | Share | AI | Points |
|---|---|---|---|
Protocol, ration and the enclosure log.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 32% | +5.1 |
Go in, clean and the one that will not come off.EstimateNo public source provides a precise figure. This is our estimate. | 22% | 8% | +1.8 |
Enrichment, the public and not teaching badly.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 22% | +3.5 |
Vet, the sign and calling it in time.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 28% | +4.5 |
Escape, the protocol and not improvising.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 18% | +2.9 |
Not losing an animal, and not skipping the lock.EstimateNo public source provides a precise figure. This is our estimate. | 14% | 12% | +1.7 |
| Total | 100% | 19% |
Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low
Skills and activities
- enclosures
- zoo rations
- enrichment
- escape protocol
- vet log
- lock-up
- enclosure clean
- the public
Sources for this job· O*NET 39-2021.00· ESCO/ISCO 5164
IS WORK OVER?
Facilities engineer
22%
#392 / 753
View rankingFacilities engineer
Where the time goes
Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.
The time saving for each task is estimated separately.
| Task | Share | AI | Points |
|---|---|---|---|
CMMS, tickets and the PPM.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 40% | +6.4 |
Roof, the chiller and the one that will not start.EstimateNo public source provides a precise figure. This is our estimate. | 18% | 14% | +2.5 |
Generator, the diesel and not leaving it dry.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 28% | +4.5 |
Fire, the pump and the monthly test.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 22% | +3.5 |
The tenant, August and not jumping to a yes.EstimateNo public source provides a precise figure. This is our estimate. | 18% | 18% | +3.2 |
That cooling does not die, and not leaving the generator dry.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 12% | +1.9 |
| Total | 100% | 22% |
Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low
Skills and activities
- CMMS
- PPM
- chillers
- generators
- diesel
- fire pumps
- roofs
- tickets
Sources for this job· O*NET 17-2199.00· ESCO/ISCO 2149