Automation index
How much of a Zookeeper’s job can AI already do?
An enclosure protocol comes earlier. Going in, feeding and not losing an animal do not.
This percentage does not predict how many people will lose their jobs.
Task comparison
IS WORK OVER?
Zookeeper
19%
AI can already do 19% of this job.
#489 / 633
View rankingZookeeper
Where the time goes
Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.
The time saving for each task is estimated separately.
| Task | Share | AI | Points |
|---|---|---|---|
Protocol, ration and the enclosure log.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 32% | +5.1 |
Go in, clean and the one that will not come off.EstimateNo public source provides a precise figure. This is our estimate. | 22% | 8% | +1.8 |
Enrichment, the public and not teaching badly.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 22% | +3.5 |
Vet, the sign and calling it in time.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 28% | +4.5 |
Escape, the protocol and not improvising.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 18% | +2.9 |
Not losing an animal, and not skipping the lock.EstimateNo public source provides a precise figure. This is our estimate. | 14% | 12% | +1.7 |
| Total | 100% | 19% |
Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low
Skills and activities
- enclosures
- zoo rations
- enrichment
- escape protocol
- vet log
- lock-up
- enclosure clean
- the public
Sources for this job· O*NET 39-2021.00· ESCO/ISCO 5164
IS WORK OVER?
Geological engineer
25%
#238 / 633
View rankingGeological engineer
Where the time goes
Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.
The time saving for each task is estimated separately.
| Task | Share | AI | Points |
|---|---|---|---|
Boreholes, lab and the geotech profile.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 44% | +7 |
Field, outcrop and what the map misses.EstimateNo public source provides a precise figure. This is our estimate. | 18% | 16% | +2.9 |
Foundations, slopes and the risk report.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 36% | +5.8 |
Tunnel, water and the support.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 28% | +4.5 |
The works that move, and stop or go.EstimateNo public source provides a precise figure. This is our estimate. | 18% | 14% | +2.5 |
Call the ground, and sign the report.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 12% | +1.9 |
| Total | 100% | 25% |
Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low
Skills and activities
- boreholes
- geotech profile
- foundations
- slopes
- tunnel support
- outcrops
- geological risk
- ground reports
Sources for this job· O*NET 17-2151.00· ESCO/ISCO 2146