IS WORK OVER?

Automation index

How much of a Zookeeper’s job can AI already do?

An enclosure protocol comes earlier. Going in, feeding and not losing an animal do not.

This percentage does not predict how many people will lose their jobs.

Task comparison

Zookeeper

Where the time goes

Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.

The time saving for each task is estimated separately.

TaskShareAIPoints
Protocol, ration and the enclosure log.
Estimate

No public source provides a precise figure. This is our estimate.

16%32%+5.1
Go in, clean and the one that will not come off.
Estimate

No public source provides a precise figure. This is our estimate.

22%8%+1.8
Enrichment, the public and not teaching badly.
Estimate

No public source provides a precise figure. This is our estimate.

16%22%+3.5
Vet, the sign and calling it in time.
Estimate

No public source provides a precise figure. This is our estimate.

16%28%+4.5
Escape, the protocol and not improvising.
Estimate

No public source provides a precise figure. This is our estimate.

16%18%+2.9
Not losing an animal, and not skipping the lock.
Estimate

No public source provides a precise figure. This is our estimate.

14%12%+1.7
Total100%19%

Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low

Skills and activities

  • enclosures
  • zoo rations
  • enrichment
  • escape protocol
  • vet log
  • lock-up
  • enclosure clean
  • the public

Sources for this job· O*NET 39-2021.00· ESCO/ISCO 5164

Mechanical engineer

Where the time goes

Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.

The time saving for each task is estimated separately.

TaskShareAIPoints
Calculate, model and simulate parts and assemblies.
Estimate

No public source provides a precise figure. This is our estimate.

18%48%+8.6
Drawings, tolerances and bills of materials.
Estimate

No public source provides a precise figure. This is our estimate.

16%32%+5.1
Meetings with shop, client and purchasing.
Estimate

No public source provides a precise figure. This is our estimate.

16%22%+3.5
Tests, prototypes and commissioning.
Estimate

No public source provides a precise figure. This is our estimate.

18%18%+3.2
Rules, quality and CE documentation.
Estimate

No public source provides a precise figure. This is our estimate.

16%16%+2.6
Sign, register and own the design.
Estimate

No public source provides a precise figure. This is our estimate.

16%14%+2.2
Total100%25%

Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low

Skills and activities

  • Meetings with shop, client and purchasing
  • Tests, prototypes and commissioning
  • Rules, quality and CE documentation
  • Sign, register and own the design
  • ingeniero mecanico
  • mechanical engineer

Sources for this job· O*NET 17-2141.00· ESCO/ISCO 2144

Analyse my job

Jobs with similar scores

  1. 486Metro driver19%
  2. 487Tram driver19%
  3. 488Ham carver19%
  4. 490Chimney sweep19%
  5. 491Film director19%
  6. 492Gilder19%