Automation index
How much of a Zookeeper’s job can AI already do?
An enclosure protocol comes earlier. Going in, feeding and not losing an animal do not.
This percentage does not predict how many people will lose their jobs.
Task comparison
IS WORK OVER?
Zookeeper
19%
AI can already do 19% of this job.
#489 / 633
View rankingZookeeper
Where the time goes
Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.
The time saving for each task is estimated separately.
| Task | Share | AI | Points |
|---|---|---|---|
Protocol, ration and the enclosure log.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 32% | +5.1 |
Go in, clean and the one that will not come off.EstimateNo public source provides a precise figure. This is our estimate. | 22% | 8% | +1.8 |
Enrichment, the public and not teaching badly.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 22% | +3.5 |
Vet, the sign and calling it in time.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 28% | +4.5 |
Escape, the protocol and not improvising.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 18% | +2.9 |
Not losing an animal, and not skipping the lock.EstimateNo public source provides a precise figure. This is our estimate. | 14% | 12% | +1.7 |
| Total | 100% | 19% |
Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low
Skills and activities
- enclosures
- zoo rations
- enrichment
- escape protocol
- vet log
- lock-up
- enclosure clean
- the public
Sources for this job· O*NET 39-2021.00· ESCO/ISCO 5164
IS WORK OVER?
Process engineer
26%
#205 / 633
View rankingProcess engineer
Where the time goes
Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.
The time saving for each task is estimated separately.
| Task | Share | AI | Points |
|---|---|---|---|
P&IDs, balances and the operating procedure.EstimateNo public source provides a precise figure. This is our estimate. | 18% | 48% | +8.6 |
Plant, trials and the real bottleneck.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 22% | +3.5 |
Capacity, yields and the improvement report.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 40% | +6.4 |
Start-up, shutdown and the shift that skips the SOP.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 18% | +2.9 |
Process safety and the HAZOP that hurts.EstimateNo public source provides a precise figure. This is our estimate. | 18% | 14% | +2.5 |
Not overloading the reactor, and signing the change.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 12% | +1.9 |
| Total | 100% | 26% |
Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low
Skills and activities
- P&IDs
- mass balances
- HAZOP
- plant start-up
- improve yields
- SOP
- bottlenecks
- process safety
Sources for this job· O*NET 17-2112.00· ESCO/ISCO 2141