Automation index
How much of a Zookeeper’s job can AI already do?
An enclosure protocol comes earlier. Going in, feeding and not losing an animal do not.
This percentage does not predict how many people will lose their jobs.
Task comparison
IS WORK OVER?
Zookeeper
19%
AI can already do 19% of this job.
#580 / 743
View rankingZookeeper
Where the time goes
Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.
The time saving for each task is estimated separately.
| Task | Share | AI | Points |
|---|---|---|---|
Protocol, ration and the enclosure log.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 32% | +5.1 |
Go in, clean and the one that will not come off.EstimateNo public source provides a precise figure. This is our estimate. | 22% | 8% | +1.8 |
Enrichment, the public and not teaching badly.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 22% | +3.5 |
Vet, the sign and calling it in time.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 28% | +4.5 |
Escape, the protocol and not improvising.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 18% | +2.9 |
Not losing an animal, and not skipping the lock.EstimateNo public source provides a precise figure. This is our estimate. | 14% | 12% | +1.7 |
| Total | 100% | 19% |
Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low
Skills and activities
- enclosures
- zoo rations
- enrichment
- escape protocol
- vet log
- lock-up
- enclosure clean
- the public
Sources for this job· O*NET 39-2021.00· ESCO/ISCO 5164
IS WORK OVER?
Site engineer
19%
#598 / 743
View rankingSite engineer
Where the time goes
Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.
The time saving for each task is estimated separately.
| Task | Share | AI | Points |
|---|---|---|---|
Setting-out, axes and the level.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 32% | +5.1 |
Rebar, cover and the one that is missing.EstimateNo public source provides a precise figure. This is our estimate. | 22% | 8% | +1.8 |
Concrete, the slump and not pouring if it fails.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 22% | +3.5 |
Note, the diary and not dressing the delay.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 28% | +4.5 |
The site manager, the rush and not covering bad steel.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 18% | +2.9 |
That the column is there, and not covering the steel.EstimateNo public source provides a precise figure. This is our estimate. | 14% | 12% | +1.7 |
| Total | 100% | 19% |
Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low
Skills and activities
- setting-out
- axes
- rebar
- cover
- slump
- site diary
- levels
- not cover steel
Sources for this job· O*NET 17-2051.00· ESCO/ISCO 2142