IS WORK OVER?

Automation index

How much of a Zoologist’s job can AI already do?

A census comes earlier. Following the animal without disturbing it do not.

This percentage does not predict how many people will lose their jobs.

Task comparison

Zoologist

Where the time goes

Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.

The time saving for each task is estimated separately.

TaskShareAIPoints
Census, marks and the protocol.
Estimate

No public source provides a precise figure. This is our estimate.

16%40%+6.4
Field, the sign and the one that does not show.
Estimate

No public source provides a precise figure. This is our estimate.

18%14%+2.5
Data, the model and not inflating.
Estimate

No public source provides a precise figure. This is our estimate.

16%28%+4.5
Report, the works and the corridor.
Estimate

No public source provides a precise figure. This is our estimate.

16%22%+3.5
The storm, the nest and not getting close.
Estimate

No public source provides a precise figure. This is our estimate.

18%18%+3.2
Follow, and not disturbing.
Estimate

No public source provides a precise figure. This is our estimate.

16%12%+1.9
Total100%22%

Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low

Skills and activities

  • censuses
  • signs
  • marks
  • corridors
  • nests
  • field protocols
  • population models
  • works

Sources for this job· O*NET 19-1023.00· ESCO/ISCO 2131

Crane operator

Where the time goes

Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.

The time saving for each task is estimated separately.

TaskShareAIPoints
Lift plan, radii and weights.
Estimate

No public source provides a precise figure. This is our estimate.

16%28%+4.5
Run the crane and place the load.
Estimate

No public source provides a precise figure. This is our estimate.

24%8%+1.9
Signals, wind and exclusion zone.
Estimate

No public source provides a precise figure. This is our estimate.

16%12%+1.9
Site, foreman and maintenance.
Estimate

No public source provides a precise figure. This is our estimate.

16%18%+2.9
Logs, inspections and machine tests.
Estimate

No public source provides a precise figure. This is our estimate.

14%22%+3.1
Not leaving a load over someone.
Estimate

No public source provides a precise figure. This is our estimate.

14%14%+2
Total100%16%

Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low

Skills and activities

  • Lift plan, radii and weights
  • Run the crane and place the load
  • Signals, wind and exclusion zone
  • Site, foreman and maintenance
  • Logs, inspections and machine tests
  • Not leaving a load over someone
  • gruista
  • operador de grua
  • crane operator

Sources for this job· O*NET 53-7021.00· ESCO/ISCO 8343

Analyse my job

Jobs with similar scores

  1. 400Virologist22%
  2. 401Medical sales rep22%
  3. 402Nursery grower22%
  4. 404Airport ramp agent21%
  5. 405Traffic warden21%
  6. 406Anaesthetist21%