Automation index
How much of a Driving examiner’s job can AI already do?
A route card comes earlier. Calling the pass from the passenger seat do not.
This percentage does not predict how many people will lose their jobs.
Task comparison
IS WORK OVER?
Driving examiner
21%
AI can already do 21% of this job.
#417 / 633
View rankingDriving examiner
Where the time goes
Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.
The time saving for each task is estimated separately.
| Task | Share | AI | Points |
|---|---|---|---|
Route, card and the day’s draw.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 36% | +5.8 |
The test, the serious fault and the one who panics.EstimateNo public source provides a precise figure. This is our estimate. | 22% | 10% | +2.2 |
Pass or not, the report and not arguing hot.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 28% | +4.5 |
Driving school, the car and the instructor on the kerb.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 22% | +3.5 |
Rain, traffic and the same standard.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 18% | +2.9 |
A fair pass, and not giving the licence away.EstimateNo public source provides a precise figure. This is our estimate. | 14% | 12% | +1.7 |
| Total | 100% | 21% |
Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low
Skills and activities
- test routes
- serious faults
- driving pass
- test reports
- one standard
- driving schools
- candidate nerves
- the licence
Sources for this job· O*NET 13-1041.00· ESCO/ISCO 3359
IS WORK OVER?
Airport ramp agent
21%
#404 / 633
View rankingAirport ramp agent
Where the time goes
Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.
The time saving for each task is estimated separately.
| Task | Share | AI | Points |
|---|---|---|---|
Load plan, LIR and hold allocation.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 40% | +6.4 |
Load, unload, pushback and ramp assistance.EstimateNo public source provides a precise figure. This is our estimate. | 22% | 8% | +1.8 |
Bags, ULDs and special cargo.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 22% | +3.5 |
Coordinate with crew, ops and fuel.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 28% | +4.5 |
Times, delays and ramp safety.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 18% | +2.9 |
Trim, papers and liability for the load.EstimateNo public source provides a precise figure. This is our estimate. | 14% | 12% | +1.7 |
| Total | 100% | 21% |
Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low
Skills and activities
- load aircraft
- do pushback
- allocate holds
- move bags
- load planning
- ramp assistance
- handle ULDs
- ramp safety
Sources for this job· O*NET 53-6051.00· ESCO/ISCO 9333