Automation index
How much of a Driving examiner’s job can AI already do?
A route card comes earlier. Calling the pass from the passenger seat do not.
This percentage does not predict how many people will lose their jobs.
Task comparison
IS WORK OVER?
Driving examiner
21%
AI can already do 21% of this job.
#417 / 633
View rankingDriving examiner
Where the time goes
Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.
The time saving for each task is estimated separately.
| Task | Share | AI | Points |
|---|---|---|---|
Route, card and the day’s draw.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 36% | +5.8 |
The test, the serious fault and the one who panics.EstimateNo public source provides a precise figure. This is our estimate. | 22% | 10% | +2.2 |
Pass or not, the report and not arguing hot.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 28% | +4.5 |
Driving school, the car and the instructor on the kerb.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 22% | +3.5 |
Rain, traffic and the same standard.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 18% | +2.9 |
A fair pass, and not giving the licence away.EstimateNo public source provides a precise figure. This is our estimate. | 14% | 12% | +1.7 |
| Total | 100% | 21% |
Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low
Skills and activities
- test routes
- serious faults
- driving pass
- test reports
- one standard
- driving schools
- candidate nerves
- the licence
Sources for this job· O*NET 13-1041.00· ESCO/ISCO 3359
IS WORK OVER?
Cabin manager
20%
#467 / 633
View rankingCabin manager
Where the time goes
Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.
The time saving for each task is estimated separately.
| Task | Share | AI | Points |
|---|---|---|---|
Briefing, door assignment and the log.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 36% | +5.8 |
Cabin, the difficult passenger and turbulence.EstimateNo public source provides a precise figure. This is our estimate. | 22% | 8% | +1.8 |
Service, allergies and the one who is ill.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 22% | +3.5 |
Safety, the demo and the kit.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 28% | +4.5 |
Delay, overbooking and the one who will not sit.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 18% | +2.9 |
Evacuate for real, and sign the cabin.EstimateNo public source provides a precise figure. This is our estimate. | 14% | 12% | +1.7 |
| Total | 100% | 20% |
Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low
Skills and activities
- cabin briefing
- assign doors
- difficult passenger
- safety demo
- onboard allergies
- overbooking
- evacuate
- turbulence
Sources for this job· O*NET 53-2031.00· ESCO/ISCO 5111