Automation index
How much of a Driving examiner’s job can AI already do?
A route card comes earlier. Calling the pass from the passenger seat do not.
This percentage does not predict how many people will lose their jobs.
Task comparison
IS WORK OVER?
Driving examiner
21%
AI can already do 21% of this job.
#417 / 633
View rankingDriving examiner
Where the time goes
Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.
The time saving for each task is estimated separately.
| Task | Share | AI | Points |
|---|---|---|---|
Route, card and the day’s draw.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 36% | +5.8 |
The test, the serious fault and the one who panics.EstimateNo public source provides a precise figure. This is our estimate. | 22% | 10% | +2.2 |
Pass or not, the report and not arguing hot.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 28% | +4.5 |
Driving school, the car and the instructor on the kerb.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 22% | +3.5 |
Rain, traffic and the same standard.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 18% | +2.9 |
A fair pass, and not giving the licence away.EstimateNo public source provides a precise figure. This is our estimate. | 14% | 12% | +1.7 |
| Total | 100% | 21% |
Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low
Skills and activities
- test routes
- serious faults
- driving pass
- test reports
- one standard
- driving schools
- candidate nerves
- the licence
Sources for this job· O*NET 13-1041.00· ESCO/ISCO 3359
IS WORK OVER?
Cloud architect
28%
#82 / 633
View rankingCloud architect
Where the time goes
Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.
The time saving for each task is estimated separately.
| Task | Share | AI | Points |
|---|---|---|---|
Diagrams, ADRs and a first IaC pass.EstimateNo public source provides a precise figure. This is our estimate. | 22% | 48% | +10.6 |
Cost estimate, Well-Architected and gaps.EstimateNo public source provides a precise figure. This is our estimate. | 18% | 40% | +7.2 |
Review PRs, security and network.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 20% | +3.2 |
Align with security, finops and product.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 15% | +2.4 |
PoCs, real failures and vendor limits.EstimateNo public source provides a precise figure. This is our estimate. | 14% | 18% | +2.5 |
Sign the design and own the incident.EstimateNo public source provides a precise figure. This is our estimate. | 14% | 14% | +2 |
| Total | 100% | 28% |
Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low
Skills and activities
- building plans
- renders
- sign a project
- Diagrams, ADRs and a first IaC pass
- Cost estimate, Well-Architected and gaps
- Review PRs, security and network
- Align with security, finops and product
- PoCs, real failures and vendor limits
- Sign the design and own the incident
- arquitecto cloud
Sources for this job· O*NET 15-1243.01· ESCO/ISCO 2511