Automation index
How much of a Grill cook’s job can AI already do?
A doneness chart comes earlier. Marking on the grill and serving it at the point do not.
This percentage does not predict how many people will lose their jobs.
Task comparison
IS WORK OVER?
Grill cook
19%
AI can already do 19% of this job.
#478 / 633
View rankingGrill cook
Where the time goes
Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.
The time saving for each task is estimated separately.
| Task | Share | AI | Points |
|---|---|---|---|
Cut, ageing and the requested doneness.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 32% | +5.1 |
Grill, mark and the fire that dies.EstimateNo public source provides a precise figure. This is our estimate. | 22% | 8% | +1.8 |
Rest, plate and the one that goes cold.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 22% | +3.5 |
List, shrink and the expensive cut.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 28% | +4.5 |
The full room and not working too far ahead.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 18% | +2.9 |
At the point, and not drying the cut.EstimateNo public source provides a precise figure. This is our estimate. | 14% | 12% | +1.7 |
| Total | 100% | 19% |
Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low
Skills and activities
- mark on the grill
- doneness
- ageing
- rest
- plate
- cuts
- grill shrink
- the fire
Sources for this job· O*NET 35-2014.00· ESCO/ISCO 5120
IS WORK OVER?
Civil engineer
25%
#231 / 633
View rankingCivil engineer
Where the time goes
Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.
The time saving for each task is estimated separately.
| Task | Share | AI | Points |
|---|---|---|---|
Structural calcs and code checks.EstimateNo public source provides a precise figure. This is our estimate. | 22% | 42% | +9.2 |
Drawings, quantities and cost estimate.EstimateNo public source provides a precise figure. This is our estimate. | 18% | 38% | +6.8 |
Geotech and simplified impact reports.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 22% | +3.5 |
Coordination with contractor, council and suppliers.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 15% | +2.4 |
Site execution and safety control.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 12% | +1.9 |
Site authority and responsible signature.EstimateNo public source provides a precise figure. This is our estimate. | 12% | 10% | +1.2 |
| Total | 100% | 25% |
Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low
Skills and activities
- Structural calcs and code checks
- Drawings, quantities and cost estimate
- Geotech and simplified impact reports
- Site execution and safety control
- Site authority and responsible signature
- ingeniero civil
- civil engineer
- obras publicas
- caminos
Sources for this job· O*NET 17-2051.00· ESCO/ISCO 2142