Automation index
How much of a Grill cook’s job can AI already do?
A doneness chart comes earlier. Marking on the grill and serving it at the point do not.
This percentage does not predict how many people will lose their jobs.
Task comparison
IS WORK OVER?
Grill cook
19%
AI can already do 19% of this job.
#567 / 743
View rankingGrill cook
Where the time goes
Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.
The time saving for each task is estimated separately.
| Task | Share | AI | Points |
|---|---|---|---|
Cut, ageing and the requested doneness.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 32% | +5.1 |
Grill, mark and the fire that dies.EstimateNo public source provides a precise figure. This is our estimate. | 22% | 8% | +1.8 |
Rest, plate and the one that goes cold.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 22% | +3.5 |
List, shrink and the expensive cut.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 28% | +4.5 |
The full room and not working too far ahead.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 18% | +2.9 |
At the point, and not drying the cut.EstimateNo public source provides a precise figure. This is our estimate. | 14% | 12% | +1.7 |
| Total | 100% | 19% |
Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low
Skills and activities
- mark on the grill
- doneness
- ageing
- rest
- plate
- cuts
- grill shrink
- the fire
Sources for this job· O*NET 35-2014.00· ESCO/ISCO 5120
IS WORK OVER?
Railway engineer
22%
#396 / 743
View rankingRailway engineer
Where the time goes
Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.
The time saving for each task is estimated separately.
| Task | Share | AI | Points |
|---|---|---|---|
Track, geometry and the study.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 40% | +6.4 |
Points, the blade and the one that will not close.EstimateNo public source provides a precise figure. This is our estimate. | 18% | 14% | +2.5 |
OLE, the height and the gauge.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 28% | +4.5 |
Works, the possession and not leaving the wire wrong.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 22% | +3.5 |
The operator, the rush and not jumping to a yes.EstimateNo public source provides a precise figure. This is our estimate. | 18% | 18% | +3.2 |
That it does not derail, and not signing half-done points.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 12% | +1.9 |
| Total | 100% | 22% |
Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low
Skills and activities
- track geometry
- points
- OLE
- gauge
- possessions
- blades
- railway studies
- not jump to a yes
Sources for this job· O*NET 17-2051.00· ESCO/ISCO 2142