IS WORK OVER?

Automation index

How much of a Metro driver’s job can AI already do?

ATO and a log come earlier. Driving a full train and reacting in the tunnel do not.

This percentage does not predict how many people will lose their jobs.

Task comparison

Metro driver

Where the time goes

Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.

The time saving for each task is estimated separately.

TaskShareAIPoints
Checks, tests and the cab log.
Estimate

No public source provides a precise figure. This is our estimate.

16%32%+5.1
Drive, stop at platforms and regulate running.
Estimate

No public source provides a precise figure. This is our estimate.

24%8%+1.9
Incidents, evacuation and talk to Control.
Estimate

No public source provides a precise figure. This is our estimate.

16%22%+3.5
Timetables, reliefs and the day’s orders.
Estimate

No public source provides a precise figure. This is our estimate.

16%28%+4.5
Passengers, platforms and announcements.
Estimate

No public source provides a precise figure. This is our estimate.

14%18%+2.5
Rules, fatigue and liability for the train.
Estimate

No public source provides a precise figure. This is our estimate.

14%12%+1.7
Total100%19%

Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low

Skills and activities

  • drive metro trains
  • stop at platforms
  • regulate running
  • evacuate tunnels
  • talk to control
  • cab checks
  • handle incidents
  • drive under ATO

Sources for this job· O*NET 53-4041.00· ESCO/ISCO 8311

Chimney sweep

Where the time goes

Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.

The time saving for each task is estimated separately.

TaskShareAIPoints
Inspection, camera and the flue report.
Estimate

No public source provides a precise figure. This is our estimate.

16%32%+5.1
Climb, sweep and the nest that blocks.
Estimate

No public source provides a precise figure. This is our estimate.

22%8%+1.8
Tightness, draught and the one that will not draw.
Estimate

No public source provides a precise figure. This is our estimate.

16%22%+3.5
Certificate, rules and the residents.
Estimate

No public source provides a precise figure. This is our estimate.

16%28%+4.5
The wet roof and not falling.
Estimate

No public source provides a precise figure. This is our estimate.

16%18%+2.9
Clean for real, and not leaving loose soot.
Estimate

No public source provides a precise figure. This is our estimate.

14%12%+1.7
Total100%19%

Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low

Skills and activities

  • sweep chimneys
  • flue camera
  • draught
  • flue certificate
  • nests
  • roofs
  • tightness
  • soot

Sources for this job· O*NET 47-4071.00· ESCO/ISCO 7133

Analyse my job

Jobs with similar scores

  1. 483Ship captain19%
  2. 484Ceramicist19%
  3. 485Executive chef19%
  4. 487Tram driver19%
  5. 488Ham carver19%
  6. 489Zookeeper19%