IS WORK OVER?

Automation index

How much of a Metro driver’s job can AI already do?

ATO and a log come earlier. Driving a full train and reacting in the tunnel do not.

This percentage does not predict how many people will lose their jobs.

Task comparison

Metro driver

Where the time goes

Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.

The time saving for each task is estimated separately.

TaskShareAIPoints
Checks, tests and the cab log.
Estimate

No public source provides a precise figure. This is our estimate.

16%32%+5.1
Drive, stop at platforms and regulate running.
Estimate

No public source provides a precise figure. This is our estimate.

24%8%+1.9
Incidents, evacuation and talk to Control.
Estimate

No public source provides a precise figure. This is our estimate.

16%22%+3.5
Timetables, reliefs and the day’s orders.
Estimate

No public source provides a precise figure. This is our estimate.

16%28%+4.5
Passengers, platforms and announcements.
Estimate

No public source provides a precise figure. This is our estimate.

14%18%+2.5
Rules, fatigue and liability for the train.
Estimate

No public source provides a precise figure. This is our estimate.

14%12%+1.7
Total100%19%

Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low

Skills and activities

  • drive metro trains
  • stop at platforms
  • regulate running
  • evacuate tunnels
  • talk to control
  • cab checks
  • handle incidents
  • drive under ATO

Sources for this job· O*NET 53-4041.00· ESCO/ISCO 8311

Energy engineer

Where the time goes

Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.

The time saving for each task is estimated separately.

TaskShareAIPoints
Energy audit, curves and the saving potential.
Estimate

No public source provides a precise figure. This is our estimate.

18%48%+8.6
Contracts, tariffs and the power market.
Estimate

No public source provides a precise figure. This is our estimate.

16%36%+5.8
Plant, meters and what the meter misses.
Estimate

No public source provides a precise figure. This is our estimate.

16%22%+3.5
Efficiency projects and the real payback.
Estimate

No public source provides a precise figure. This is our estimate.

16%28%+4.5
The board, the CAPEX and the no to the project.
Estimate

No public source provides a precise figure. This is our estimate.

18%14%+2.5
Save for real, and not selling green smoke.
Estimate

No public source provides a precise figure. This is our estimate.

16%12%+1.9
Total100%27%

Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low

Skills and activities

  • energy audit
  • load curves
  • power tariffs
  • energy efficiency
  • CAPEX payback
  • plant metering
  • power market
  • real savings

Sources for this job· O*NET 17-2199.00· ESCO/ISCO 2149

Analyse my job

Jobs with similar scores

  1. 492Ship captain19%
  2. 493Ceramicist19%
  3. 494Executive chef19%
  4. 496Tram driver19%
  5. 497Ham carver19%
  6. 498Zookeeper19%