IS WORK OVER?

Automation index

How much of a Metro driver’s job can AI already do?

ATO and a log come earlier. Driving a full train and reacting in the tunnel do not.

This percentage does not predict how many people will lose their jobs.

Task comparison

Metro driver

Where the time goes

Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.

The time saving for each task is estimated separately.

TaskShareAIPoints
Checks, tests and the cab log.
Estimate

No public source provides a precise figure. This is our estimate.

16%32%+5.1
Drive, stop at platforms and regulate running.
Estimate

No public source provides a precise figure. This is our estimate.

24%8%+1.9
Incidents, evacuation and talk to Control.
Estimate

No public source provides a precise figure. This is our estimate.

16%22%+3.5
Timetables, reliefs and the day’s orders.
Estimate

No public source provides a precise figure. This is our estimate.

16%28%+4.5
Passengers, platforms and announcements.
Estimate

No public source provides a precise figure. This is our estimate.

14%18%+2.5
Rules, fatigue and liability for the train.
Estimate

No public source provides a precise figure. This is our estimate.

14%12%+1.7
Total100%19%

Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low

Skills and activities

  • drive metro trains
  • stop at platforms
  • regulate running
  • evacuate tunnels
  • talk to control
  • cab checks
  • handle incidents
  • drive under ATO

Sources for this job· O*NET 53-4041.00· ESCO/ISCO 8311

Gas network engineer

Where the time goes

Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.

The time saving for each task is estimated separately.

TaskShareAIPoints
Model, pressures and the diameter.
Estimate

No public source provides a precise figure. This is our estimate.

16%40%+6.4
Trench, the weld and the one that was not x-rayed.
Estimate

No public source provides a precise figure. This is our estimate.

18%14%+2.5
Leak, the detector and getting people out.
Estimate

No public source provides a precise figure. This is our estimate.

16%28%+4.5
Cut, the bypass and not leaving them without gas.
Estimate

No public source provides a precise figure. This is our estimate.

16%22%+3.5
The council, the rush and not covering without testing.
Estimate

No public source provides a precise figure. This is our estimate.

18%18%+3.2
That the trench does not go up, and not leaving them without gas.
Estimate

No public source provides a precise figure. This is our estimate.

16%12%+1.9
Total100%22%

Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low

Skills and activities

  • network pressures
  • diameters
  • trenches
  • gas welds
  • leaks
  • detectors
  • bypass
  • x-rays

Sources for this job· O*NET 17-2171.00· ESCO/ISCO 2145

Analyse my job

Jobs with similar scores

  1. 581Ship captain19%
  2. 582Ceramicist19%
  3. 583Executive chef19%
  4. 585Tram driver19%
  5. 586Shipbuilder19%
  6. 587Ham carver19%