Automation index
How much of a Pork butcher’s job can AI already do?
A marinade recipe comes earlier. Curing the loin and slicing the ham at the right point do not.
This percentage does not predict how many people will lose their jobs.
Task comparison
IS WORK OVER?
Pork butcher
21%
AI can already do 21% of this job.
#504 / 753
View rankingPork butcher
Where the time goes
Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.
The time saving for each task is estimated separately.
| Task | Share | AI | Points |
|---|---|---|---|
Marinade, cure and the salt point.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 36% | +5.8 |
Break down, stuff and the tie.EstimateNo public source provides a precise figure. This is our estimate. | 18% | 12% | +2.2 |
Counter, slicing and the one who wants it thin.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 28% | +4.5 |
Cold room, shrink and the batch that goes.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 22% | +3.5 |
The holiday, the order and not running out of chorizo.EstimateNo public source provides a precise figure. This is our estimate. | 18% | 18% | +3.2 |
The ham’s point, and not selling it too dry.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 12% | +1.9 |
| Total | 100% | 21% |
Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low
Skills and activities
- cure loins
- stuff sausage
- slice ham
- marinades
- tying
- curing room
- chorizo
- break down pork
Sources for this job· O*NET 51-3021.00· ESCO/ISCO 7511
IS WORK OVER?
Substation technician
19%
#660 / 753
View rankingSubstation technician
Where the time goes
Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.
The time saving for each task is estimated separately.
| Task | Share | AI | Points |
|---|---|---|---|
Switching, the sheet and the lockout.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 32% | +5.1 |
Bay, the earth and not going in without it.EstimateNo public source provides a precise figure. This is our estimate. | 22% | 8% | +1.8 |
Oil, the analysis and the one that bites.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 22% | +3.5 |
Fault, the disconnector and not resetting blind.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 28% | +4.5 |
Control and not jumping to a yes.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 18% | +2.9 |
Open the right one, and not going in unearthed.EstimateNo public source provides a precise figure. This is our estimate. | 14% | 12% | +1.7 |
| Total | 100% | 19% |
Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low
Skills and activities
- switching
- substation sheets
- earths
- bays
- oil
- lockouts
- disconnectors
- not go in unearthed
Sources for this job· O*NET 49-2095.00· ESCO/ISCO 3113