Automation index
How much of a Secondary teacher’s job can AI already do?
A unit plan comes earlier. Them being quiet, working, and nobody left out, do not.
This percentage does not predict how many people will lose their jobs.
Task comparison
IS WORK OVER?
Secondary teacher
22%
AI can already do 22% of this job.
#461 / 763
View rankingSecondary teacher
Where the time goes
Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.
The time saving for each task is estimated separately.
| Task | Share | AI | Points |
|---|---|---|---|
Unit, criteria and the exam.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 40% | +6.4 |
Classroom, the group and the one who blows it up.EstimateNo public source provides a precise figure. This is our estimate. | 18% | 14% | +2.5 |
Cover, the corridor and the fight.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 28% | +4.5 |
Family, the report and not giving a 5 for quiet.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 22% | +3.5 |
Staff, inspection and not dressing it.EstimateNo public source provides a precise figure. This is our estimate. | 18% | 18% | +3.2 |
That they work, and nobody left out.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 12% | +1.9 |
| Total | 100% | 22% |
Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low
Skills and activities
- unit plans
- assessment criteria
- secondary cover
- corridors
- the report
- staff meeting
- schools inspection
- behaviour
Sources for this job· O*NET 25-2031.00· ESCO/ISCO 2330
IS WORK OVER?
HVAC engineer
27%
#178 / 763
View rankingHVAC engineer
Where the time goes
Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.
The time saving for each task is estimated separately.
| Task | Share | AI | Points |
|---|---|---|---|
Loads, flows and the plant.EstimateNo public source provides a precise figure. This is our estimate. | 18% | 48% | +8.6 |
Works, the duct and the one they crushed.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 40% | +6.4 |
Commissioning, the balance and the room that sweats.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 22% | +3.5 |
Noise, the grille and not leaving the whistle.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 28% | +4.5 |
The client, the saving and not killing the fresh air.EstimateNo public source provides a precise figure. This is our estimate. | 18% | 14% | +2.5 |
That it does not sweat, and not oversizing.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 12% | +1.9 |
| Total | 100% | 27% |
Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low
Skills and activities
- load calcs
- air flows
- ducts
- balancing
- grilles
- fresh air
- whistles
- HVAC plant
Sources for this job· O*NET 17-2199.00· ESCO/ISCO 2149