IS WORK OVER?

Automation index

How much of a Ship captain’s job can AI already do?

A passage plan and a log come earlier. Deciding in ugly weather with people aboard does not.

This percentage does not predict how many people will lose their jobs.

Task comparison

Ship captain

Where the time goes

Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.

The time saving for each task is estimated separately.

TaskShareAIPoints
Passage plan, weather and clearance.
Estimate

No public source provides a precise figure. This is our estimate.

16%32%+5.1
Bridge, manoeuvre and people aboard.
Estimate

No public source provides a precise figure. This is our estimate.

20%12%+2.4
Crew, watches and fatigue.
Estimate

No public source provides a precise figure. This is our estimate.

16%18%+2.9
Port, pilots and owner.
Estimate

No public source provides a precise figure. This is our estimate.

16%22%+3.5
Safety, SOPEP and breakdowns.
Estimate

No public source provides a precise figure. This is our estimate.

16%16%+2.6
Not losing a ship or a person.
Estimate

No public source provides a precise figure. This is our estimate.

16%14%+2.2
Total100%19%

Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low

Skills and activities

  • Passage plan, weather and clearance
  • Bridge, manoeuvre and people aboard
  • Crew, watches and fatigue
  • Port, pilots and owner
  • Safety, SOPEP and breakdowns
  • Not losing a ship or a person
  • capitan de barco
  • patron de altura
  • ship captain

Sources for this job· O*NET 53-5021.00· ESCO/ISCO 3152

Process engineer

Where the time goes

Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.

The time saving for each task is estimated separately.

TaskShareAIPoints
P&IDs, balances and the operating procedure.
Estimate

No public source provides a precise figure. This is our estimate.

18%48%+8.6
Plant, trials and the real bottleneck.
Estimate

No public source provides a precise figure. This is our estimate.

16%22%+3.5
Capacity, yields and the improvement report.
Estimate

No public source provides a precise figure. This is our estimate.

16%40%+6.4
Start-up, shutdown and the shift that skips the SOP.
Estimate

No public source provides a precise figure. This is our estimate.

16%18%+2.9
Process safety and the HAZOP that hurts.
Estimate

No public source provides a precise figure. This is our estimate.

18%14%+2.5
Not overloading the reactor, and signing the change.
Estimate

No public source provides a precise figure. This is our estimate.

16%12%+1.9
Total100%26%

Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low

Skills and activities

  • P&IDs
  • mass balances
  • HAZOP
  • plant start-up
  • improve yields
  • SOP
  • bottlenecks
  • process safety

Sources for this job· O*NET 17-2112.00· ESCO/ISCO 2141

Analyse my job

Jobs with similar scores

  1. 480Dental assistant19%
  2. 481Embroiderer19%
  3. 482Bellhop19%
  4. 484Ceramicist19%
  5. 485Executive chef19%
  6. 486Metro driver19%