IS WORK OVER?

Automation index

How much of a Ship captain’s job can AI already do?

A passage plan and a log come earlier. Deciding in ugly weather with people aboard does not.

This percentage does not predict how many people will lose their jobs.

Task comparison

Ship captain

Where the time goes

Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.

The time saving for each task is estimated separately.

TaskShareAIPoints
Passage plan, weather and clearance.
Estimate

No public source provides a precise figure. This is our estimate.

16%32%+5.1
Bridge, manoeuvre and people aboard.
Estimate

No public source provides a precise figure. This is our estimate.

20%12%+2.4
Crew, watches and fatigue.
Estimate

No public source provides a precise figure. This is our estimate.

16%18%+2.9
Port, pilots and owner.
Estimate

No public source provides a precise figure. This is our estimate.

16%22%+3.5
Safety, SOPEP and breakdowns.
Estimate

No public source provides a precise figure. This is our estimate.

16%16%+2.6
Not losing a ship or a person.
Estimate

No public source provides a precise figure. This is our estimate.

16%14%+2.2
Total100%19%

Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low

Skills and activities

  • Passage plan, weather and clearance
  • Bridge, manoeuvre and people aboard
  • Crew, watches and fatigue
  • Port, pilots and owner
  • Safety, SOPEP and breakdowns
  • Not losing a ship or a person
  • capitan de barco
  • patron de altura
  • ship captain

Sources for this job· O*NET 53-5021.00· ESCO/ISCO 3152

Prompt engineer

Where the time goes

Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.

The time saving for each task is estimated separately.

TaskShareAIPoints
Design prompts, tools and chains.
Estimate

No public source provides a precise figure. This is our estimate.

24%58%+13.9
Evals, datasets and regressions.
Estimate

No public source provides a precise figure. This is our estimate.

18%52%+9.4
Integrate with product and safety limits.
Estimate

No public source provides a precise figure. This is our estimate.

16%22%+3.5
Talk to the business about a good output.
Estimate

No public source provides a precise figure. This is our estimate.

16%18%+2.9
Watch hallucinations, bias and cost.
Estimate

No public source provides a precise figure. This is our estimate.

14%20%+2.8
Decide what the model gets, and what it does not.
Estimate

No public source provides a precise figure. This is our estimate.

12%16%+1.9
Total100%34%

Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low

Skills and activities

  • Design prompts, tools and chains
  • Evals, datasets and regressions
  • Integrate with product and safety limits
  • Talk to the business about a good output
  • Watch hallucinations, bias and cost
  • prompt engineer
  • ingeniero de prompts
  • llm engineer

Sources for this job· O*NET 15-1252.00· ESCO/ISCO 2512

Analyse my job

Jobs with similar scores

  1. 480Dental assistant19%
  2. 481Embroiderer19%
  3. 482Bellhop19%
  4. 484Ceramicist19%
  5. 485Executive chef19%
  6. 486Metro driver19%