Automation index
How much of a Ship captain’s job can AI already do?
A passage plan and a log come earlier. Deciding in ugly weather with people aboard does not.
This percentage does not predict how many people will lose their jobs.
Task comparison
IS WORK OVER?
Ship captain
19%
AI can already do 19% of this job.
#581 / 753
View rankingShip captain
Where the time goes
Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.
The time saving for each task is estimated separately.
| Task | Share | AI | Points |
|---|---|---|---|
Passage plan, weather and clearance.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 32% | +5.1 |
Bridge, manoeuvre and people aboard.EstimateNo public source provides a precise figure. This is our estimate. | 20% | 12% | +2.4 |
Crew, watches and fatigue.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 18% | +2.9 |
Port, pilots and owner.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 22% | +3.5 |
Safety, SOPEP and breakdowns.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 16% | +2.6 |
Not losing a ship or a person.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 14% | +2.2 |
| Total | 100% | 19% |
Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low
Skills and activities
- Passage plan, weather and clearance
- Bridge, manoeuvre and people aboard
- Crew, watches and fatigue
- Port, pilots and owner
- Safety, SOPEP and breakdowns
- Not losing a ship or a person
- capitan de barco
- patron de altura
- ship captain
Sources for this job· O*NET 53-5021.00· ESCO/ISCO 3152
IS WORK OVER?
Substation technician
19%
#660 / 753
View rankingSubstation technician
Where the time goes
Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.
The time saving for each task is estimated separately.
| Task | Share | AI | Points |
|---|---|---|---|
Switching, the sheet and the lockout.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 32% | +5.1 |
Bay, the earth and not going in without it.EstimateNo public source provides a precise figure. This is our estimate. | 22% | 8% | +1.8 |
Oil, the analysis and the one that bites.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 22% | +3.5 |
Fault, the disconnector and not resetting blind.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 28% | +4.5 |
Control and not jumping to a yes.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 18% | +2.9 |
Open the right one, and not going in unearthed.EstimateNo public source provides a precise figure. This is our estimate. | 14% | 12% | +1.7 |
| Total | 100% | 19% |
Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low
Skills and activities
- switching
- substation sheets
- earths
- bays
- oil
- lockouts
- disconnectors
- not go in unearthed
Sources for this job· O*NET 49-2095.00· ESCO/ISCO 3113