Automation index
How much of a Ship captain’s job can AI already do?
A passage plan and a log come earlier. Deciding in ugly weather with people aboard does not.
This percentage does not predict how many people will lose their jobs.
Task comparison
IS WORK OVER?
Ship captain
19%
AI can already do 19% of this job.
#492 / 643
View rankingShip captain
Where the time goes
Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.
The time saving for each task is estimated separately.
| Task | Share | AI | Points |
|---|---|---|---|
Passage plan, weather and clearance.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 32% | +5.1 |
Bridge, manoeuvre and people aboard.EstimateNo public source provides a precise figure. This is our estimate. | 20% | 12% | +2.4 |
Crew, watches and fatigue.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 18% | +2.9 |
Port, pilots and owner.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 22% | +3.5 |
Safety, SOPEP and breakdowns.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 16% | +2.6 |
Not losing a ship or a person.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 14% | +2.2 |
| Total | 100% | 19% |
Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low
Skills and activities
- Passage plan, weather and clearance
- Bridge, manoeuvre and people aboard
- Crew, watches and fatigue
- Port, pilots and owner
- Safety, SOPEP and breakdowns
- Not losing a ship or a person
- capitan de barco
- patron de altura
- ship captain
Sources for this job· O*NET 53-5021.00· ESCO/ISCO 3152
IS WORK OVER?
Tower crane operator
18%
#583 / 643
View rankingTower crane operator
Where the time goes
Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.
The time saving for each task is estimated separately.
| Task | Share | AI | Points |
|---|---|---|---|
Radius, winds and the day’s log.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 32% | +5.1 |
Hoist, trolley and the slinger’s call.EstimateNo public source provides a precise figure. This is our estimate. | 24% | 6% | +1.4 |
Erect, climb and the base that is checked.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 22% | +3.5 |
Two-crane lifts and crossing jibs.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 28% | +4.5 |
The wind that gets up and stopping in time.EstimateNo public source provides a precise figure. This is our estimate. | 14% | 18% | +2.5 |
Sweep nobody, and not pushing the radius.EstimateNo public source provides a precise figure. This is our estimate. | 14% | 10% | +1.4 |
| Total | 100% | 18% |
Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low
Skills and activities
- tower-crane lifts
- load charts
- climb the crane
- slinger’s call
- jib wind
- crossing jibs
- crane base
- trolley
Sources for this job· O*NET 53-7021.00· ESCO/ISCO 8343