IS WORK OVER?

Automation index

How much of a Tram driver’s job can AI already do?

Urban ATO comes earlier. Crossing pedestrians without clipping the badly parked car do not.

This percentage does not predict how many people will lose their jobs.

Task comparison

Tram driver

Where the time goes

Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.

The time saving for each task is estimated separately.

TaskShareAIPoints
Checks, log and the cab.
Estimate

No public source provides a precise figure. This is our estimate.

16%32%+5.1
Drive, stops and the pedestrian who steps out.
Estimate

No public source provides a precise figure. This is our estimate.

24%8%+1.9
Badly parked car, calls and Control.
Estimate

No public source provides a precise figure. This is our estimate.

16%22%+3.5
Timetable, reliefs and rush hour.
Estimate

No public source provides a precise figure. This is our estimate.

16%28%+4.5
The tourist, the bike and not over-hooting.
Estimate

No public source provides a precise figure. This is our estimate.

14%18%+2.5
Hit nobody, and make the terminus.
Estimate

No public source provides a precise figure. This is our estimate.

14%12%+1.7
Total100%19%

Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low

Skills and activities

  • drive trams
  • urban stops
  • pedestrians
  • badly parked cars
  • Control
  • rush hour
  • cab checks
  • terminus

Sources for this job· O*NET 53-4041.00· ESCO/ISCO 8311

Factory operator

Where the time goes

Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.

The time saving for each task is estimated separately.

TaskShareAIPoints
Logs, SOPs and quality records.
Estimate

No public source provides a precise figure. This is our estimate.

16%38%+6.1
Read orders and line screens.
Estimate

No public source provides a precise figure. This is our estimate.

14%32%+4.5
Feed, run and unjam the line.
Estimate

No public source provides a precise figure. This is our estimate.

22%18%+4
Changeover and tool cleaning.
Estimate

No public source provides a precise figure. This is our estimate.

16%22%+3.5
In-station quality and stopping a defect.
Estimate

No public source provides a precise figure. This is our estimate.

16%20%+3.2
Shifts, safety and coworkers.
Estimate

No public source provides a precise figure. This is our estimate.

16%16%+2.6
Total100%24%

Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low

Skills and activities

  • Logs, SOPs and quality records
  • Read orders and line screens
  • Feed, run and unjam the line
  • Changeover and tool cleaning
  • In-station quality and stopping a defect
  • Shifts, safety and coworkers
  • operario de fabrica
  • factory operator
  • linea de produccion

Sources for this job· O*NET 51-2099.00· ESCO/ISCO 8211

Analyse my job

Jobs with similar scores

  1. 484Ceramicist19%
  2. 485Executive chef19%
  3. 486Metro driver19%
  4. 488Ham carver19%
  5. 489Zookeeper19%
  6. 490Chimney sweep19%