Automation index
How much of a Tram driver’s job can AI already do?
Urban ATO comes earlier. Crossing pedestrians without clipping the badly parked car do not.
This percentage does not predict how many people will lose their jobs.
Task comparison
IS WORK OVER?
Tram driver
19%
AI can already do 19% of this job.
#496 / 643
View rankingTram driver
Where the time goes
Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.
The time saving for each task is estimated separately.
| Task | Share | AI | Points |
|---|---|---|---|
Checks, log and the cab.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 32% | +5.1 |
Drive, stops and the pedestrian who steps out.EstimateNo public source provides a precise figure. This is our estimate. | 24% | 8% | +1.9 |
Badly parked car, calls and Control.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 22% | +3.5 |
Timetable, reliefs and rush hour.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 28% | +4.5 |
The tourist, the bike and not over-hooting.EstimateNo public source provides a precise figure. This is our estimate. | 14% | 18% | +2.5 |
Hit nobody, and make the terminus.EstimateNo public source provides a precise figure. This is our estimate. | 14% | 12% | +1.7 |
| Total | 100% | 19% |
Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low
Skills and activities
- drive trams
- urban stops
- pedestrians
- badly parked cars
- Control
- rush hour
- cab checks
- terminus
Sources for this job· O*NET 53-4041.00· ESCO/ISCO 8311
IS WORK OVER?
Petroleum engineer
25%
#237 / 643
View rankingPetroleum engineer
Where the time goes
Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.
The time saving for each task is estimated separately.
| Task | Share | AI | Points |
|---|---|---|---|
Reservoir, rate and the well programme.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 44% | +7 |
Rig, mud and lost circulation.EstimateNo public source provides a precise figure. This is our estimate. | 18% | 14% | +2.5 |
Completion, tests and the ops report.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 36% | +5.8 |
Production, water cut and the workover.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 28% | +4.5 |
HSE, blowout and the drill that is not a game.EstimateNo public source provides a precise figure. This is our estimate. | 18% | 16% | +2.9 |
Not killing the well, and signing the programme.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 12% | +1.9 |
| Total | 100% | 25% |
Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low
Skills and activities
- model reservoirs
- well programmes
- drilling mud
- completion
- workover
- water cut
- well HSE
- production tests
Sources for this job· O*NET 17-2171.00· ESCO/ISCO 2146