IS WORK OVER?

Automation index

Can AI do a Scrum master’s job?

Facilitates the agile team, clears blockers and keeps the process.

It is not an estimate of how many people will lose their work.

IS WORK OVER?

Scrum master

37%

AI or a robot can already do 37% of this job.

#25 / 182

Where the week goes

Score = Σ (weight × saving). Weights are our frequency estimate, not an O*NET time %. Saving is separate evidence or estimate.

Task weights are our estimate from O*NET frequency (FT). O*NET does not publish share of the week.

Task Share AI Adds
Modify existing software to correct errors, adapt it to new hardware, or upgrade interfaces and improve performance.
Estimate

No public source pins this saving. It is an estimate from the method.

11% 28% +3.1
Design, develop and modify software systems, using scientific analysis and mathematical models to predict and measure outcomes and consequences of design.
Estimate

No public source pins this saving. It is an estimate from the method.

10% 48% +4.8
Store, retrieve, and manipulate data for analysis of system capabilities and requirements.
Estimate

No public source pins this saving. It is an estimate from the method.

10% 48% +4.8
Confer with systems analysts, engineers, programmers and others to design systems and to obtain information on project limitations and capabilities, performance requirements and interfaces.
Estimate

No public source pins this saving. It is an estimate from the method.

9% 48% +4.3
Supervise the work of programmers, technologists and technicians and other engineering and scientific personnel.
Estimate

No public source pins this saving. It is an estimate from the method.

8% 22% +1.8
Analyze user needs and software requirements to determine feasibility of design within time and cost constraints.
Estimate

No public source pins this saving. It is an estimate from the method.

7% 48% +3.4
Develop or direct software system testing or validation procedures, programming, or documentation.
Estimate

No public source pins this saving. It is an estimate from the method.

7% 55% +3.9
Consult with customers or other departments on project status, proposals, or technical issues, such as software system design or maintenance.
Estimate

No public source pins this saving. It is an estimate from the method.

5% 28% +1.4
Other less frequent tasks (weight estimated from frequency).
Estimate

No public source pins this saving. It is an estimate from the method.

33% 28% +9.2
Total 100% 37%

Modelled week 100% · Public evidence 0% · Estimate 100% · Confidence: Low

Occupation sources · O*NET 15-1252.00 · ESCO/ISCO 2512

Analyse my job

Nearby in the ranking

  1. 22 Database administrator 37%
  2. 23 DevOps engineer 37%
  3. 24 Lab technician 37%
  4. 26 Senior developer 37%
  5. 27 Compliance officer 36%
  6. 28 Content moderator 36%