Automation index
Can AI do a Scrum master’s job?
Facilitates the agile team, clears blockers and keeps the process.
It is not an estimate of how many people will lose their work.
IS WORK OVER?
Scrum master
37%
AI or a robot can already do 37% of this job.
#25 / 182
isworkover.com
Where the week goes
Score = Σ (weight × saving). Weights are our frequency estimate, not an O*NET time %. Saving is separate evidence or estimate.
Task weights are our estimate from O*NET frequency (FT). O*NET does not publish share of the week.
| Task | Share | AI | Adds |
|---|---|---|---|
Modify existing software to correct errors, adapt it to new hardware, or upgrade interfaces and improve performance.
EstimateNo public source pins this saving. It is an estimate from the method. |
11% | 28% | +3.1 |
Design, develop and modify software systems, using scientific analysis and mathematical models to predict and measure outcomes and consequences of design.
EstimateNo public source pins this saving. It is an estimate from the method. |
10% | 48% | +4.8 |
Store, retrieve, and manipulate data for analysis of system capabilities and requirements.
EstimateNo public source pins this saving. It is an estimate from the method. |
10% | 48% | +4.8 |
Confer with systems analysts, engineers, programmers and others to design systems and to obtain information on project limitations and capabilities, performance requirements and interfaces.
EstimateNo public source pins this saving. It is an estimate from the method. |
9% | 48% | +4.3 |
Supervise the work of programmers, technologists and technicians and other engineering and scientific personnel.
EstimateNo public source pins this saving. It is an estimate from the method. |
8% | 22% | +1.8 |
Analyze user needs and software requirements to determine feasibility of design within time and cost constraints.
EstimateNo public source pins this saving. It is an estimate from the method. |
7% | 48% | +3.4 |
Develop or direct software system testing or validation procedures, programming, or documentation.
EstimateNo public source pins this saving. It is an estimate from the method. |
7% | 55% | +3.9 |
Consult with customers or other departments on project status, proposals, or technical issues, such as software system design or maintenance.
EstimateNo public source pins this saving. It is an estimate from the method. |
5% | 28% | +1.4 |
Other less frequent tasks (weight estimated from frequency).
EstimateNo public source pins this saving. It is an estimate from the method. |
33% | 28% | +9.2 |
| Total | 100% | 37% |
Modelled week 100% · Public evidence 0% · Estimate 100% · Confidence: Low
Occupation sources · O*NET 15-1252.00 · ESCO/ISCO 2512